Compaction of soils required for different types materials for embankment and subgrade are shown here based on IS:2720 – part-8. Following table shows the relative compaction for different soil types:
Sl. No. |
Type of work / material |
Relative compaction as percentage of maximum laboratory dry density |
1 |
Subgrade and earthen shoulders |
Not more than 97 |
2 |
Embankment |
Not more than 95 |
3 |
Expansive clays |
 |
a)Â Â Â Â Â Subgrade and 500mm portion below subgrade |
Not allowed |
|
b)Â Â Â Â Â Remaining portion of embankment |
Not more than 90 |
Selection of compaction rollers for different soil types:
Types of compaction rollers |
Suitability of compaction roller for different types of soils |
||
Cohesive soils |
Well graded granular and dry cohesive soils |
Uniformly graded materials |
|
1. Smooth wheeled roller |
Suitable |
Suitable |
Suitable only if the roller is towed by tractors and the load per cm width of the roller is less than 55kg. |
2. Pneumatic |
Suitable |
Suitable when load on each wheel is more than 2 tonnes |
Suitable only if the roller is towed by tractors and load on each wheel is less than 1.5 tonnes |
3. Vibratory roller |
Suitable only when the static load per cm width of the vibratory roller is more than 7kg. |
Suitable |
Suitable but when the static load per cm width of the vibratory roller is more than 12 kg, the roller should be towed by tractors. |
4. Sheep foot roller |
Suitable |
Unsuitable |
Unsuitable |
4. Power rammer |
Suitable |
Suitable |
Unsuitable |
Density requirement of embankments and subgrade material:
This requirement of density of soil for embankment and subgrade is based on results obtained when tested as per IS 2720 – (Part – 8).
S. No. |
Type of work |
Maximum laboratory dry density (unit weight) |
1. |
Embankments upto 3m height and not subjected to extensive flooding |
Not less than 15.2 kN/m3 |
2. |
Embankments exceeding 3m height or embankments of any height subject to long period of inundation |
Not less than 16.0 kN/m3Â |
3. |
Subgrade and earthen shoulders / verges / backfill |
Not less than 17.5 kN/m3 |