How to control wastage of concrete at site? While estimating quantity of concrete for particular structural work, we normally consider 3-5% as wastage. But wastage of concrete more than that can increase the cost of project and may impact project progress. So, it is necessary to control the concrete wastage at site. Concrete wastage can be prevented by proper planning of pour. Concrete pour cards shall be prepared for pre-concreting checks. In that way, the quantity of concrete to be poured can be known before mixing of concrete starts. The concrete production speed should be matched with pouring speed to avoid the waiting time, to avoid the setting of concrete before placement and wastage. Near the completing of concrete pour, the approximate quantity shall be estimated and batching plant operator shall be informed of the same to avoid extra concrete supply, to avoid the wastage of concrete.HOW TO CONTROL WASTAGE OF CONCRETE AT SITE?
Home/ Concrete Technology/HOW TO CONTROL WASTAGE OF CONCRETE AT SITE?Do you need to remove the ads? Become VIP Member