đź•‘ Reading time: 1 minute
The components of sewer sanity project cost such as design and construction cost are discussed in the following sections.Contents:
Components of sewer sanitary project cost
Design Cost
This involves the cost of planning, studying various options, environmental evaluation, geotechnical investigation, surveying, engineering design, permitting and review cost. The cost of design is often make small portion of the project total cost. It is reported that, design cost is less than 20% of the total project fee for reconstruction project whereas it is less than 10% for newly constructed project.