There are four techniques used to set grade and line in the construction of sanitary sewer system. One of these methods or combination thereof may be used in the construction. These methods are discussed in the following sections.
Fig.1: Sanitary Sewer Line and Grade
Contents:
- Methods of Setting Line and Grade in Construction of Sewer Sanitary System
- 1. Stakes or crosses installed on the surface on an offset from the centerline of sewer sanitary
- 2. Stakes are installed in the bottom of the trench on the sanitary sewer line as the rough grade for the sanitary sewer is completed
- 3. Elevations given for the finished trench grade and sanitary sewer invert while sanitary sewer construction progresses
- 4. A laser beam of light set in the manhole or a specified height above sanitary sewer flow line
Methods of Setting Line and Grade in Construction of Sewer Sanitary System
- Stakes or crosses installed on the surface on an offset from the centerline of sewer sanitary
- Stakes are installed in the bottom of the trench on the sanitary sewer line as the rough grade for the sanitary sewer is completed
- Elevations given for the finished trench grade and sanitary sewer invert while sanitary sewer construction progresses
- A laser beam of light set in the manhole or a specified height above sanitary sewer flow line