🕑 Reading time: 1 minute
The Pile load capacity calculation will determine the ultimate load the pile foundation can take under service load condition. This capacity is also called as bearing capacity of piles. The piles installed can be a single pile or group piles. Hence the load calculation for a single pile and group pile will be different. This is done for given load condition or for the size of foundation. Here the load carrying capacity calculation for both single piles and group piles.Contents:
Single Pile Load Capacity Calculation
Here the vertical load and the horizontal load acting on the pile has to be determined.Calculation of Vertical Load

Fig.1: Vertical Load on Pile
The allowable resistance to compression Rac of a single pile is provided by the end bearing, Feb and the skin friction for each strata, Fsf. Thus,
Rac = Feb + Total (Fsf ) Eq.1
Therefore, the maximum compressive service load that can be supported by a single pile is its total resistance Rac , less the self-weight of the pile, W. ThusNser < Rac -W = Rnet Eq.2
A pile can also resist a tensile load. The maximum tensile service load, that can be resisted by pile isRat = Total (Fsf )+ W Eq.3
The soil exploration details will provide the details of the end bearing and the skin friction value. These values are obtained by test loadings and pile driving energy procedures. These ultimate values are divided by a partial factor of safety of between 2 and 3 to give the allowable values Feb and Fsf.Calculation of Horizontal Load

Fig.2: Horizontal load on piles
- Maximum deflection on the structure
- Structural Capacity of the pile
Group Pile Load Capacity Calculation
In order to support heavy loads, the piles are arranged in groups. The piles are arranged in groups so that the size and the cost of construction of pile cap can be reduced.
Fig.3.Group Pile Capacity

Fig.4.The minimum clear spacing between piles
= 2D(L+K)k1 + BLk2 Eq.4
Where k1 and k2 are soil coefficients. Individual pile loads within the group are limited to the single pile capacity.