What are the properties of good building stones?
aviratdhodare
APPEARANCE The stone to be used for facework must have uniform and pleasing color. It must be free from cavities, crack, flaws and patches of loose and soft materials. STRENGTH A good bldg stone should have sufficient crushing strength to withstand the load of superstructure. It should ≮ 1000 kg/cm²Read more
APPEARANCE
STRENGTH
HARDNESS, TOUGHNESS AND RESISTANCE TO ABRASION
DURABILITY
TEXTURE
A good bldg stone should have a closed grained and compact texture.
WORKABILITY
The stone to be used for ornamental craving and architectural appearance should be easily and economically dressed.
SEASONING
The stone to be used for an imp interior work should be well seasoned. Presence of moisture makes the stone soft and it is liable to an early decay when used in structural work.
POROSITY
RESISTANCE TO FIRE
SPECIFIC GRAVITY
RESISTANCE TO ELECTRICITY
Why is the risk of efflorescence formation in cement-based materials high in coastal areas?
aviratdhodare
Efflorescence is layer of salts left behind by an evaporating sol'n of salts on masonry surfaces. It is quite usual on plastered walls, ceilings, concrete, cement plastering, and painted walls. Why and how does it occur? It occurs when the dissolved salts in cement, sand, and water in constructionsRead more
Efflorescence is layer of salts left behind by an evaporating sol’n of salts on masonry surfaces. It is quite usual on plastered walls, ceilings, concrete, cement plastering, and painted walls.
Why and how does it occur? It occurs when the dissolved salts in cement, sand, and water in constructions are brought to the surface through leaching. In the second stage, the water evaporates to the atmosphere leaving powdery crystalline salts on the surface.
These salts could be present in cement due to breakdown and aging.
The sand used is of inferior quality containing salts. Though river sands are used in construction, excessive quarrying could lead to poorer quality. Instead of using sand from river or lake beds, adulteration with seashore sand could be the cause.
Water used for curing is impure with dissolved salts in it. Saline water with dissolved salts could turn out to be the culprit.
At the initial stages, the formation of a salt layer on the surface could go unnoticed. However repetitive cycles of evaporation and leaching steadily build-up the salt and the seriousness of the problem is visual. In some cases, growth in fungi could be noticed accompanied by efflorescence leading to unhygienic spaces.
Let us turn our attention to the question of the acceleration of corrosion near the seashores. Galvanic corrosion is the type of corrosion noticed near seashores. Salt in the form of aerosols reaches places located 30 KM inshore.
Salt, water, and the wind are the players that accelerate the corrosion process. Near the seashores, all these prime ingredients are readily available.
See lessShrinkage reinforcement direction and percentage in wing walls
aviratdhodare
Make it simple. The quantity of rebar should be according to moment or min reqd. About the direction, simply find the direction of moment and give the rebars to resist them.
Make it simple. The quantity of rebar should be according to moment or min reqd. About the direction, simply find the direction of moment and give the rebars to resist them.
See lessWhich country provides highest salary to civil engineers?
aviratdhodare
Highest Paying Countries for Civil Engineer Switzerland: Average annual salary: $ 77, 438 (Approx. Rs. 50,33470) Denmark: The average annual salary happens to be: $ 71,565 (Approx. Rs 46,51725) Norway: Average annual salary: $ 67,154 (Approx. Rs 43,65010) U.S.: Average annual salary: $ 62, 019 (ApprRead more
Highest Paying Countries for Civil Engineer
How is resection done in survey?
aviratdhodare
Resection Method. This method is used for establishing the instrument stations or after completing the traverse surveying the important object cannot be located due to difficulties & missed the station. PROCESS:- Select the two stations P & Q on the ground & measure the length PQ & pRead more
Resection Method.
This method is used for establishing the instrument stations or after completing the traverse surveying the important object cannot be located due to difficulties & missed the station. PROCESS:-
what is the height of brickwork after which extra cost for brickwork is provided as per schedule of rates?
aviratdhodare
Normally, after three meter from the DPC of ground floor level or one floor which should not be more than 4 m height, contactor can charge for extra height if it is not mentioned in the contract about this .
Normally, after three meter from the DPC of ground floor level or one floor which should not be more than 4 m height, contactor can charge for extra height if it is not mentioned in the contract about this .
See lesswhat precautions should be taken during the cube test?
aviratdhodare
The cube test is the Remove the specimen from water after specified curing time and wipe out excess water from the surface. Place the specimen in the machine in such a manner that the load shall be applied to the opposite sides of thecube cast. Align the specimen centrally on the base plate of the mRead more
The cube test is the Remove the specimen from water after specified curing time and wipe out excess water from the surface. Place the specimen in the machine in such a manner that the load shall be applied to the opposite sides of thecube cast. Align the specimen centrally on the base plate of the machine.
Precautions for Tests The water for curing should be tested every 7 days and the temperature of the water must be at 27+-2oC. Procedure for Concrete Cube Test Remove the specimen from the water after specified curing time and wipe out excess water from the surface.
Cube Testing The cubes are generally tested at 7 & 28 days unless specific early tests are required, for example to remove a concrete shutter safely prior to 7 days. Usually 1 cube will be tested at 7 days and 2 cubes at 28 days, however this may vary depending of the requirements, check the design first.
See lessWhat is the percentage of carbon in wrought iron?
aviratdhodare
Wrought iron is a form of commercial iron containing less than 0.10% of carbon, less than 0.25% of impurities total of sulfur, phosphorus, silicon and manganese, and less than 2% slag by weight. Wrought iron is redshort or hot short if it contains sulfur in excess quantity.
Wrought iron is a form of commercial iron containing less than 0.10% of carbon, less than 0.25% of impurities total of sulfur, phosphorus, silicon and manganese, and less than 2% slag by weight. Wrought iron is redshort or hot short if it contains sulfur in excess quantity.
See less