I am a newly recruited site engineer so i am having a doubt. In the design drawing it was done based on M25 concrete and Fe500 steel and while making the BoQ we have mentioned M20 and Fe500. Now we ...
My plot of land is low lying and needs to be earth filled for approximately 1 to 1.5 metre. Now my question is that Can i start foundation of a 2 storey building on the ground without excavation ? after that we can filled the rest of the plot with earth.
My plot of land is low lying and needs to be earth filled for approximately 1 to 1.5 metre. Now my question is that Can i start foundation of a 2 storey building on the ground without excavation ? after that we can filled the rest of the plot with earth.
See less
Madeh Izat Hamakareem
You do not need to change your steel.
You do not need to change your steel.
See less