What is the height of brickwork after which an extra cost for brickwork is provided as per schedule of rates?
If the columns and their foundations have been designed considering the loads (direct force and moment) from the iron gates then a tie beam at ground level is not necessary. But a tie beam can help in reducing the foundation width in one direction as this beam will help to prevent overturning in oneRead more
If the columns and their foundations have been designed considering the loads (direct force and moment) from the iron gates then a tie beam at ground level is not necessary.
But a tie beam can help in reducing the foundation width in one direction as this beam will help to prevent overturning in one direction (if the columns are not joined by plinth beams towards wall boundaries). Another benefit of a tie beam is the extra strength provided in case of impact by a vehicle to the columns.
See less
aviratdhodare
Normally, after three meter from the DPC of ground floor level or one floor which should not be more than 4 m height, contactor can charge for extra height if it is not mentioned in the contract about this .
Normally, after three meter from the DPC of ground floor level or one floor which should not be more than 4 m height, contactor can charge for extra height if it is not mentioned in the contract about this .
See less