Join

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Log in
Continue with Facebook
Continue with Google
or use


Have an account? Log in Now

Log in

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Join Here

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Join Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Log in Now

Sorry, you do not have permission to ask a question, You must login to ask question. Become VIP Member

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Join Here
Become VIP Member
The Constructor Logo The Constructor Logo
Log inJoin

The Constructor

The Constructor Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write Article
  • Questions
    • Recent Questions
    • Popular Questions
    • Polls
    • Ask a Question
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital tools
    • Geotechnical
      • Foundation
Search
VIP Dashboard

Mobile menu

Close
Ask a Question
  • Questions
    • Popular Questions
    • Trending Questions
    • New Questions
    • No Answer Questions
  • Ask Questions
  • Write for us
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

How to pour Concrete in Narrow/Sleak Columns?

Home/ Questions/Q 180772
Next
In Process

Do you need to remove the ads? Become VIP Member

Asked: October 10, 20202020-10-10T15:24:58+05:30 2020-10-10T15:24:58+05:30In: Construction Site Related
Velisiwe Purity
Velisiwe Purity

Velisiwe Purity

  • 1 Question
  • 0 Answers
  • 0 Best Answers
  • 10 Points
View Profile
Velisiwe Purity User

How to pour Concrete in Narrow/Sleak Columns?

  • 0
  • 3 3 Answers
  • 563 Views
  • 0 Followers
  • 0
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

3 Answers

  • Voted
  • Oldest
  • Recent
  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    2020-10-10T16:48:50+05:30Added an answer on October 10, 2020 at 4:48 pm

    Generally, pouring concrete in narrow columns needs great caution to ensure the achievement of designated strength and durability because of its narrowness. Place the concrete in layers, and compact each layer properly to obtain a consolidated concrete mass that encircles steel bars and has low permeability. Use vibrations to consolidate fresh concrete, but avoid over-vibration as it may cause segregation.

    Here are some steps or points which are helpful for pouring the concrete in narrow/sleak column :-

    1. If the height of the column form is not considerably long, pour concrete from the top of the forms.
    2. Place concrete at or close to its final position.
    3. Pour concrete in layers with a thickness ranging from 30cm to 50cm if the height of the RC column is large.
    4. The period between successive concrete layers should not be longer than half an hour for normal concreting conditions and 20 minutes in case of hot weather conditions.
    5. Freefall of concrete from the trunk end should be done from 0.9 to 1.5m (occasionally restricted to 0.6m); otherwise, segregation would occur.
    6. The concrete freefall should be continuous. Prevent separation because of free falling of concrete over reinforcement or other embedded objects.
    7. Discharge concrete into the formworks directly without the use of chutes, trunks, or hoppers, if possible, to decrease segregation possibilities.
    8. Vibrate each layer to compact it properly. Lift the vibrator after the complete compaction of each concrete layer. Extend vibrator into the previous layer by 10-15cm.
    9. If the supply of concrete interrupts during concrete pouring, try to avoid the formation of cold joints in the column.
    10. Sometimes, set retarder materials might be used to the concrete surface to delay its setting and create a good bond with the next batch of concrete. Sugar can retard the concrete setting time by up to four hours. The next layer of concrete should be thinner than previous ones, and vibration should extend into the previous layers.
    11. In RC columns, start concrete pouring with 5 to 10 cm grout to avoid collection of loose stones at the bottom that lead to honeycomb formation. The grout slump is the same as the concrete slump with the same or lower w/c ratio.
    12. Alternatively, place the same concrete mix with half coarse aggregate at the bottom with a thickness range from 15-30cm.
    13. Roughen concrete surfaces after initial set with brush, if, for any reason concreting stops for a day to create good bonding with the next concrete layer.
    14. In summary, avoid problems arising from improper concreting practices by preventing full depth placement of concrete at one point, a lower slump for upper layers, preventing lateral movement of vibrators in concrete, and thoroughly vibrating concrete.

    • 33
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  2. Komal Bhandakkar

    Komal Bhandakkar

    • 46 Questions
    • 255 Answers
    • 0 Best Answers
    • 2,040 Points
    View Profile
    Komal Bhandakkar AUTHOR
    2020-10-14T13:45:40+05:30Added an answer on October 14, 2020 at 1:45 pm
    This answer was edited.

    Pouring concrete in columns needs great caution to ensure the achievement of designated strength and durability.

    Place the concrete in layers and compact each layer properly to obtain a consolidated contract mass that in circles Steel bars and has low permeability.

    Use vibrations to consolidate fresh contract but avoid over vibration as it may cause segregation in concrete Improper concreting procedures may cause the segregation, honeycomb, and reinforcement corrosion. As a result, the concrete column or concrete wall may deteriorate and fail.

    Pouring of concrete in the column:

    If the height of the wall or the column form is not considering it’s long then poured concrete from the top of the forms. Please concrete at or close to its final position.

    Pour concrete in layers with a thickness ranging from 30 to 50 cm if the height of the reinforced concrete column is large.

    Place concrete walls with a maximum of 60cm layer in one pass to avoid segregation.

    For walls deeper than 1.2 meters then pour concrete to vertical trunks positioned at an interval of 2.4 meters.

    The freefall of contract from the trunk and should be done from 0.9 to 1.5m otherwise segregation would occur.

    Discharge contract into the form for a character without the use of trunk, if possible to decrease the segregation possibilities.


    Thank you.      

    • 21
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  3. Preet Chovatiya

    Preet Chovatiya

    • 11 Questions
    • 81 Answers
    • 5 Best Answers
    • 858 Points
    View Profile
    Preet Chovatiya Learner
    2020-11-28T19:11:10+05:30Added an answer on November 28, 2020 at 7:11 pm

    You can use Self Compacted Concrete to use for narrow columns. It also used where the reinforcement is heavy and process of compaction is not available/difficult to compact.

    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp

You must login to add an answer.

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Need An Account, Join Here

Sidebar

Popular Articles

  • Gopal Mishra

    Types of Foundation for Buildings and their Uses [PDF]

  • Gopal Mishra

    Compressive Strength of Concrete -Cube Test [PDF], Procedure, Results

  • Padmanabhan G

    Methods of Rainwater Harvesting [PDF]: Components, Transport, and Storage

  • Sadanandam Anupoju

    16 Types of Heavy Equipment Used in Construction

  • Fasi Ur Rahman

    Standard Size of Rooms in Residential Building and their Locations

Recent Articles

  • Xian

    Bricklaying Robots in Construction #2

  • Xian

    Welcome to the Gutenberg Editor

  • Xian

    Bricklaying Robots in Construction

  • Ravi Panwar

    Rongjiang Bridge: The World’s Longest Bridge of Rigid Girder and Flexible Arch

  • Ravi Panwar

    Qinghai–Tibet Railway: The Longest and Highest Highland Railway in the World

Recent Questions

  • Shailendra

    In what case is a Shear Key provided in Foundation?

    • 0 Answers
  • Salman

    What is piping technology for termite treatment in building?

    • 0 Answers
  • nikeetasharma

    Which instrument is widely used for surveying?

    • 1 Answer
  • nikeetasharma

    Which type of reinforcement are used in pre-stressing?

    • 0 Answers
  • Bhavani Pesaru

    How can we use magnetic levitation method in civil engineering?

    • 0 Answers

Explore

  • Questions
    • Popular Questions
    • Trending Questions
    • New Questions
    • No Answer Questions
  • Ask Questions
  • Write for us
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Home
  • About Us
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.