when to reject ready mixed concrete on-site according to its strengths?
such as: 5000 psi – 10000psi
Is slump test can be enough basis?
Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.
Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.
Lost your password? Please enter your email address. You will receive a link and will create a new password via email.
Komal Bhandakkar
Tests of RMC on site:
Introduction:
Following are some important tests conducted on RMC on site:
Laboratory test:
aviratdhodare
Talking of RMC than the designation Mix is certified on the supply challan. Further in case of doubt you can seek copy of the design mix formula followed. As regards slump test it is simply done to check the workability so as to ensure that delay in supply has not stiffened it which can create problems of flow into moulds. Strength is known after 7/8 days of casting which you can randomly do @45 cum of a lot.
Madeh Izat Hamakareem
Please have a look at the following article regarding quality control of ready mix in the field.
https://test.theconstructor.org/practical-guide/inspection-testing-ready-mix-concrete/25716/