đź•‘ Reading time: 1 minute
To build a new city or Township, surveying is to be done by considering all development works necessary for the city. The development works like street roads, property boundaries, water and sanitary pipes location, electrical lines, telephone lines etc. are involved in the city surveying.Contents:
Surveying Maps for a Township
Proper maps should be prepared for each of the systems of the city during surveying such as:- Topographic map
- Street map
- Property map
- Water supply and sanitary map
- Electrification map
- Telephone line map
Instruments for Surveying City or Township
Before discussing the preparation of maps, we must know the instruments used to conduct city surveying and they are- Transit theodolite with tripod
- Leveling instrument with tripod
- Plane table instruments
- Leveling staff
- Ranging rods, pegs, optical square, arrows etc.
- Metric chain
- Metallic tape
- Invar tape