An auditorium of size 42m x 25m is under construction, whose plinth is completed and backfilling is in process. The client has requested for compaction test of the backfill. The compaction test is carried out by the core cutting method. How ...
No Answer Questions
Home/No Answer Questions/Page 3Do you need to remove the ads? Become VIP Member
Discy Latest Questions
What is the function of cross beam at the box girders and the bearing plates?
What is the minimum requirement of fire rating for 4 storey buildings for solid walls?
What is short column effect? Explain its behavior against earthquake action?
We are experiencing a drought at the moment. The use of water is limited and therefore effecting the curing of concrete. We want to make more use of plastic to limit the evaporation of water as long as possible. What ...
I need some information about stabilization of soil by Rock Dust.
How much cement can be replaced by GGBS in readymix concrete? What is the mix design of M40 grade concrete with GGBS?
What is fly ash silo ? Describe the design and detailing of Fly ash silo ?