What is your current work status?
Hi sir, I am a intern student at AFCON. and also doing final year degree from Maharashtra.
Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.
Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.
Lost your password? Please enter your email address. You will receive a link and will create a new password via email.
Sorry, you do not have permission to ask a question, You must login to ask question. Become VIP Member
Sorry, you do not have permission to ask a question, You must login to ask question. Become VIP Member
Do you need to remove the ads? Become VIP Member
What is your profession?
Hi sir, I am a intern student at AFCON. and also doing final year degree from Maharashtra.
How to repair the damaged beams and walls in load-bearing construction as shown in the images below. As seen in the picture, the structure has been broken to make way for drain pipes.
There are certain methods to remove the delaminated concrete, and then formwork is to be fixe. After that, the application of repair material like a dry pack, and wet pack, shotcrete, is carried out if reinforcement is not removed while fixing the pipe. You can try one other method also, by fixing pRead more
There are certain methods to remove the delaminated concrete, and then formwork is to be fixe. After that, the application of repair material like a dry pack, and wet pack, shotcrete, is carried out if reinforcement is not removed while fixing the pipe.
You can try one other method also, by fixing plate bonding in the beam on the bottom to enhance the flexural strength, you will have to rest the plate on the bricks, and for that, you will have to remove the top layer of the brick. You also may need to provide scaffolding if you are altering the load-bearing wall. As it is a load-bearing structure, if any alteration is done in the load-bearing wall, it should be done with the consultation of a structural engineer.
See lessHow to calculate the quantity of water for a given mix concrete. As it would be required to calculate for mix 1:2:4.
As we know 1:2:4 ratio is for M15 concrete. Generally Water quantity is calculated as per below formula: Water Quantity=W/C ratio*Cement Quantity Generally W/C ratio is lays between 0.4 to 0.6 as per IS 10262(2009). Now first we have to assume cement quantity, so let's assume cement quantity=50 KG aRead more
As we know 1:2:4 ratio is for M15 concrete. Generally Water quantity is calculated as per below formula:
Water Quantity=W/C ratio*Cement Quantity
Generally W/C ratio is lays between 0.4 to 0.6 as per IS 10262(2009).
Now first we have to assume cement quantity, so let’s assume cement quantity=50 KG and W/C ratio=0.5
Now let’s calculate water quantity for 50 KG cement.
Water Quantity=0.5*50=25 liter.
See lessRequire the details about drop caisson
A caisson is a word that is borrowed from French caisson, which means a large box. It is related to geotechnical engineering. It is a watertight retaining structure used, for example, to work on the foundations of the bridge pier, for the construction of concrete dams or the repair of ships. It is aRead more
A caisson is a word that is borrowed from French caisson, which means a large box. It is related to geotechnical engineering. It is a watertight retaining structure used, for example, to work on the foundations of the bridge pier, for the construction of concrete dams or the repair of ships. It is a relatively sizeable deep foundation and is a permanent structure and part of the substructure.
There are four main types of the caisson, they are;
What are Various properties and optimization of alkali activated fly ash?
Properties of alkali-activated fly ash : I studied different research papers based on the above topic and I concluded that : The mortar and concrete made with Portland cement, free activated fly ash develop a highest mechanical strength Less time required to gain enough strength It has a moderate mRead more
I studied different research papers based on the above topic and I concluded that :
Thank you.
See lessI want to know minimum time required for finishing activities because I want to schedule a residential project in msproject
The most average time to build a multi family house which varies the number of units in a building. In 2014 building the twenty or more units took near about 15 months to complete from the time of obtaining permits. And properties with 10 to 19 units physically finished in 13.6 months whereas 5 to 9Read more
The most average time to build a multi family house which varies the number of units in a building.
In 2014 building the twenty or more units took near about 15 months to complete from the time of obtaining permits. And properties with 10 to 19 units physically finished in 13.6 months whereas 5 to 9 unit building came in at 11.5 months.
The average time from permits to start does not follow the same pattern with respect to property size. Properties with 10 to 19 units had the longest average waiting period.
See less
At what reading of pressure gauge the GI fitting of kitchen and bathroom should be tested?
Minimum pressure gauge for galvanized iron testing : Minimum yield strength of finished top tube should be 50000 psi Minimum tensile strength for the finished tube shall be 55000 psi The mechanical property of the finished surface of the cube is mainly depended upon the tube size and gauge. GenerallRead more
See less
Hi,sir. I am a civil engineering student from Maharashtra . I done many online course from iit through NPTEL . I also done AutoCAD ,staad.pro,blender. I got idea of this website from my IIT lecturer.
Hi,sir.
I am a civil engineering student from Maharashtra . I done many online course from iit through NPTEL .
I also done AutoCAD ,staad.pro,blender.
I got idea of this website from my IIT lecturer.
See less