Join

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Log in
Continue with Facebook
Continue with Google
or use


Have an account? Log in Now

Log in

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Join Here

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Join Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Log in Now

Sorry, you do not have permission to ask a question, You must login to ask question. Become VIP Member

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Join Here
Become VIP Member

Sorry, you do not have permission to ask a question, You must login to ask question. Become VIP Member

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Join Here
Become VIP Member
The Constructor Logo The Constructor Logo
Log inJoin

The Constructor

The Constructor Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write Article
  • Questions
    • Recent Questions
    • Popular Questions
    • Polls
    • Ask a Question
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital tools
    • Geotechnical
      • Foundation
Search
VIP Dashboard

Mobile menu

Close
Ask a Question
  • Questions
    • Popular Questions
    • Trending Questions
    • New Questions
    • No Answer Questions
  • Ask Questions
  • Write for us
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

AdityaBhandakkar - Answers

Home/ AdityaBhandakkar/Answers
Ask AdityaBhandakkar

Do you need to remove the ads? Become VIP Member

  • About
  • Questions
  • Polls
  • Answers
  • Best Answers
  • Asked Questions
  • Followed Questions
  • Favorite Questions
  • Articles
  • Comments
  • Groups
  1. Asked: July 13, 2020In: Construction Site Related

    What is spirit leveling in survey work?

    AdityaBhandakkar

    AdityaBhandakkar

    • 11 Questions
    • 250 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    Added an answer on October 28, 2020 at 11:11 pm

    Hi, Sprit levelling is the measurement of elevation difference between two adjacent points by measuring the vertical distances wrt perpendicular to gravity. A horizontal plane sight tangent to the level surface is easily established utilizing a spirit level. In spirit leveling, a spirit level and aRead more

    Hi,

    • Sprit levelling is the measurement of elevation difference between two adjacent points by measuring the vertical distances wrt perpendicular to gravity.
    • A horizontal plane sight tangent to the level surface is easily established utilizing a spirit level. In spirit leveling, a spirit level and a sighting device are combined, and vertical distances are measured by observing graduated rods placed on the points.
    • Spirit leveling also called direct leveling. This is the common and precise method used by site engineers.
    See less
    • 9
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  2. Asked: September 19, 2020In: Geotechnical Engineering

    Why is the degree of saturation of soil treated as constant throughout the consolidation process?

    AdityaBhandakkar

    AdityaBhandakkar

    • 11 Questions
    • 250 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    Added an answer on October 28, 2020 at 11:11 pm

    Hi, Consolidation itself means that reduction in the volume of soil if it is fully saturated. Otherwise, it is called compaction If saturation is not equalled to a hundred per cent. In the consolidation process, we need to decrease the volume but not decrease the amount of water in it. This processRead more

    Hi,

    1. Consolidation itself means that reduction in the volume of soil if it is fully saturated.
    2. Otherwise, it is called compaction If saturation is not equalled to a hundred per cent.
    3. In the consolidation process, we need to decrease the volume but not decrease the amount of water in it. This process is called a consolidated undrained process. In this way, the degree of saturation must be maintained up to 100% to get the final result of consolidation test.
    4. Whereas in the consolidated drained test, water allows to remove from the wall pore, and there is no need to maintain the degree of saturation up to 100%.

    Hope you the concept.

    See less
    • 9
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  3. Asked: September 19, 2020In: Geotechnical Engineering

    What is the best method for ground improvement technique?

    AdityaBhandakkar

    AdityaBhandakkar

    • 11 Questions
    • 250 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    Added an answer on October 28, 2020 at 11:11 pm

    Hi, There is no best method for ground improvement, you should adopt as per the type of soil and your requirement of stabilization and bearing capacity. Well, the steps of ground improvement techniques are according to the individual needs and plot of land and the purpose of the use of ground for imRead more

    Hi,

    There is no best method for ground improvement, you should adopt as per the type of soil and your requirement of stabilization and bearing capacity.

    Well, the steps of ground improvement techniques are according to the individual needs and plot of land and the purpose of the use of ground for improvement.

    • If the land is waterlogged, then drain out of the water from the soil.
    • If soil is already under the built-up area then there is a need to remove all the foundation and superstructure and make the foundation Deeper for new construction to increase the stability and factor of safety.
    • If the land is not level, label the light as per your need.
    • If the soil is is less bearing capacity then increase the strength by adopting methods like piling and compaction.
    • if the plot of land is used for underground water or something oil storage then it needs to apply the waterproofing and leakage looking for the storage tanks to increase the safety e and decrease the maintenance cost.

    For different types of usage of land at different methods should be adopted to make the soil improve for various uses so that it is best for domestic and commercial use.

    See less
    • 9
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  4. Asked: June 18, 2020In: Construction

    What is the Time period of a building and its relation with frequency?

    AdityaBhandakkar

    AdityaBhandakkar

    • 11 Questions
    • 250 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    Added an answer on October 19, 2020 at 8:24 am
    This answer was edited.

    Hi, Natural frequency (f) =√stiffness/√Mass of structure.  Take the case of a very tall building which is susceptible to damage whan earthquake occur will have higher group and hence lower natural frequency. Thereby, it is desirable to have higher natural frequencies. Also, at low natural frequencieRead more

    Hi,

    Natural frequency (f) =√stiffness/√Mass of structure.

    •  Take the case of a very tall building which is susceptible to damage whan earthquake occur will have higher group and hence lower natural frequency.
    • Thereby, it is desirable to have higher natural frequencies. Also, at low natural frequencies, the structure can resonate easier and hence lead to amplification.
    • I do not know enough about building dynamics to comment about this mathematically, but this is a plausible argument.
    See less
    • 33
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  5. Asked: April 11, 2020In: Concrete

    How to Repair Damaged Beams and Walls in Load Bearing Construction?

    AdityaBhandakkar

    AdityaBhandakkar

    • 11 Questions
    • 250 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    Added an answer on October 19, 2020 at 8:10 am
    This answer was edited.

    Hi, For repairing of Structures like a load-bearing wall, please refer American Concrete Institute (ACI) - 562, 562-16. It is a code used for the assessment and repairs and the rehabilitation of existing concrete structures. It is specially developed to work for the international existing building cRead more

    Hi,

    • For repairing of Structures like a load-bearing wall, please refer American Concrete Institute (ACI) – 562, 562-16.
    • It is a code used for the assessment and repairs and the rehabilitation of existing concrete structures.
    • It is specially developed to work for the international existing building code (IEBC) and the adoption of standard code alone.
    • This code provides a minimum requirement for the repairs and assessment of the concrete structures, members and also sustains where it is applicable and also for non-building structures.
    See less
    • 33
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  6. Asked: June 18, 2020In: Construction

    What is the difference between UTM and WGS in GIS software ?

    AdityaBhandakkar

    AdityaBhandakkar

    • 11 Questions
    • 250 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    Added an answer on October 19, 2020 at 8:08 am
    This answer was edited.

    Hi, UTM specifies how lat/long locations as E/N co-ordinates in the database and on the screen or a printed map.If you want to use anything other than latitude/longitude to specify locations, you need a map projection. UTM is common for larger GIS projects. WGS84 allows you to have a datum in the fuRead more

    Hi,

    1. UTM specifies how lat/long locations as E/N co-ordinates in the database and on the screen or a printed map.If you want to use anything other than latitude/longitude to specify locations, you need a map projection. UTM is common for larger GIS projects. WGS84 allows you to have a datum in the full meaning of the term, and this is projected using the map projection. UTM is a map projection system: Universal Transverse Mercator. A map projection allows you to take any latitude/longitude based location on the Earth and transform it into an E/N (or X/Y) location on a plane cartesian system. It also works in reverse.
    2. WGS is a datum and ellipsoid that model the Earth.
    3. In GIS, specifying WGS84 as the datum means you can use GPS data directly. Still, it primarily allows a definition of what you mean by the co-ordinate origin and the orientation of the reference frame’s axes, together with the reference ellipsoid you are using.
    See less
    • 32
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  7. Asked: April 2, 2020In: Concrete

    What Will be Change in Concrete Strength after 2 Years?

    AdityaBhandakkar

    AdityaBhandakkar

    • 11 Questions
    • 250 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    Added an answer on October 19, 2020 at 8:07 am
    This answer was edited.

    Hi, Refer to the chart between compressive strength in MPa Vs age of concrete pavement. Generally, the standard grade of concrete will gain a 16% strength on the first day, Remaining 40% in after 3 days and 90% after 14 days, and almost 90% after 28 days. And with an increase in time the rate of hydRead more

    Hi,

    Refer to the chart between compressive strength in MPa Vs age of concrete pavement.

    Generally, the standard grade of concrete will gain a 16% strength on the first day, Remaining 40% in after 3 days and 90% after 14 days, and almost 90% after 28 days. And with an increase in time the rate of hydration decrease decreases which increases the strength with time Show us the strength of concrete pavement increases after 2 years.

    See less
    • 33
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  8. Asked: February 12, 2020In: Concrete

    How to Calculate Rate Analysis For Concrete 1:2:4?

    AdityaBhandakkar

    AdityaBhandakkar

    • 11 Questions
    • 250 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    Added an answer on October 19, 2020 at 7:59 am
    This answer was edited.

    Hi, Please specify the type of wastage you would like to reduce. Because cement sand and aggregate are measured at the initial stage and then for the mix for making a concrete paste. So if mix ratio is correct then there is no probability of wastage of these materials. In some cases, if the mix ratiRead more

    Hi,

    Please specify the type of wastage you would like to reduce. Because cement sand and aggregate are measured at the initial stage and then for the mix for making a concrete paste. So if mix ratio is correct then there is no probability of wastage of these materials. In some cases, if the mix ratio is not proper then more amount of concrete test it is made by the labour which is considered as the waste. But it depends upon is site engineer and mix ratio. Steel reinforcement is also used in construction, which manufactured in proper length. Thus, some small parts remain in used and considered as waste.

    Hope you get the answer.

    See less
    • 33
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
1 2 3 … 32

Sidebar

Popular Articles

  • Gopal Mishra

    Types of Foundation for Buildings and their Uses [PDF]

  • Gopal Mishra

    Compressive Strength of Concrete -Cube Test [PDF], Procedure, Results

  • Padmanabhan G

    Methods of Rainwater Harvesting [PDF]: Components, Transport, and Storage

  • Sadanandam Anupoju

    16 Types of Heavy Equipment Used in Construction

  • Fasi Ur Rahman

    Standard Size of Rooms in Residential Building and their Locations

Recent Articles

  • Xian

    Bricklaying Robots in Construction #2

  • Xian

    Welcome to the Gutenberg Editor

  • Xian

    Bricklaying Robots in Construction

  • Ravi Panwar

    Rongjiang Bridge: The World’s Longest Bridge of Rigid Girder and Flexible Arch

  • Ravi Panwar

    Qinghai–Tibet Railway: The Longest and Highest Highland Railway in the World

Recent Questions

  • Shailendra

    In what case is a Shear Key provided in Foundation?

    • 0 Answers
  • Salman

    What is piping technology for termite treatment in building?

    • 0 Answers
  • nikeetasharma

    Which instrument is widely used for surveying?

    • 1 Answer
  • nikeetasharma

    Which type of reinforcement are used in pre-stressing?

    • 0 Answers
  • Bhavani Pesaru

    How can we use magnetic levitation method in civil engineering?

    • 0 Answers

Explore

  • Questions
    • Popular Questions
    • Trending Questions
    • New Questions
    • No Answer Questions
  • Ask Questions
  • Write for us
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Home
  • About Us
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.