Join

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Log in
Continue with Facebook
Continue with Google
or use


Have an account? Log in Now

Log in

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Join Here

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Join Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Log in Now

Sorry, you do not have permission to ask a question, You must login to ask question. Become VIP Member

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Join Here
Become VIP Member
The Constructor Logo The Constructor Logo
Log inJoin

The Constructor

The Constructor Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write Article
  • Questions
    • Recent Questions
    • Popular Questions
    • Polls
    • Ask a Question
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital tools
    • Geotechnical
      • Foundation
Search
VIP Dashboard

Mobile menu

Close
Ask a Question
  • Questions
    • Popular Questions
    • Trending Questions
    • New Questions
    • No Answer Questions
  • Ask Questions
  • Write for us
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Miscellaneous

Home/Miscellaneous/Page 9

Do you need to remove the ads? Become VIP Member

  • Recent Questions
  • Most Answered
  • Answers
  • No Answers
  • Most Visited
  • Most Voted
  • Random

Discy Latest Questions

Asked: July 3, 2020In: Miscellaneous

What is the criteria for choosing type of estimate in any building construction?

Ancy Joby
Ancy Joby

Ancy Joby

  • 20 Questions
  • 11 Answers
  • 1 Best Answer
  • 580 Points
View Profile
Ancy Joby Learner

What is the criteria for choosing type of estimate in any building construction?

  1. Soumyadeep Halder

    Soumyadeep Halder

    • 0 Questions
    • 29 Answers
    • 2 Best Answers
    • 57 Points
    View Profile
    Soumyadeep Halder User
    Added an answer on July 4, 2020 at 12:20 pm

    the criteria for choosing type of estimate in any building construction are given below. 1.What phase is the project in? Perhaps the most important, or at least first, determining factor for selecting the estimating method, or approach, is the project phase. Where is the project in it’s life-cycle?Read more

    the criteria for choosing type of estimate in any building construction are given below.

    1.What phase is the project in?
    Perhaps the most important, or at least first, determining factor for selecting the estimating method, or approach, is the project phase. Where is the project in it’s life-cycle? If it is in the conceptual design phase you might consider using the Universal Factors method. This method, in it’s simplest form, works as a type of “analogy” estimating approach. If you have similar past projects in your “bottom right-hand drawer” then you may be set. Otherwise, you may need to use a Universal Factors model.

    2.What project data is available?
    As they say “data is king”. That statement certainly holds true for estimating. Not only the volume, but the type of data available to you, can make all the difference in the method and accuracy of your estimate. Review the data available to you (technical or unit cost). The amount of data on hand can help you decide which method you will use, the cost drivers, and many more aspects of your estimate.

    3.What is the purpose of the estimate?
    You should always keep in mind the purpose of the estimate you are developing. Is your estimate attached to a detailed bid or proposal for a potential client or is it going to be used to “cost out” one of multiple approaches to a solution for management review? If the latter, perhaps all you need is a Rough Order of Magnitude (ROM) estimate? The estimates purpose (read: audience) determines the approach you take and what attributes of your estimate you include or highlight.

    4.What is your time-frame?
    When you have the time (and data points), it is often best practice to develop as detailed an estimate as possible. This is especially true when estimating construction or preparing a T&M bid or proposal.

    5.What estimating tools are available?
    After all is said and done, it may come down to the tools you have in your toolbox. Most estimators, and I know I am in this category, are Excel aficionados. You can often find me buried in a spreadsheet somewhere. If I am pulling together a “back-of-the-envelope” estimate I will often use Excel. However, Excel has it’s limits. There are multiple tools on the market for QTO estimating that provide management capabilities over and above what Excel can offer.

    See less
    • 1
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 1 1 Answer
  • 178 Views
  • 0 Followers
Asked: July 7, 2020In: Miscellaneous

Which software used for taking out estimation of building or any structure?

Preet Chovatiya
Preet Chovatiya

Preet Chovatiya

  • 11 Questions
  • 81 Answers
  • 5 Best Answers
  • 858 Points
View Profile
Preet Chovatiya Learner

Which software used for taking out estimation of building or any structure?

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on November 24, 2020 at 6:24 pm

    The softwares used for taking out estimation of building are as follows :- 1. ProEst Estimating Software 2. Stack Software 3. Clear Estimates Software 4. Sage Estimating Software

    The softwares used for taking out estimation of building are as follows :-
    1. ProEst Estimating Software
    2. Stack Software
    3. Clear Estimates Software
    4. Sage Estimating Software

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 2 2 Answers
  • 100 Views
  • 0 Followers
Asked: June 18, 2020In: Miscellaneous

What are the various Types of Electrical Works carried out in a High Rise Building?

Rohan Chaugule
Rohan Chaugule

Rohan Chaugule

  • 12 Questions
  • 11 Answers
  • 1 Best Answer
  • 1,045 Points
View Profile
Rohan Chaugule Expert

What are the various types of electrical works carried out in a high rise building?

  1. Komal Bhandakkar

    Komal Bhandakkar

    • 46 Questions
    • 255 Answers
    • 0 Best Answers
    • 2,040 Points
    View Profile
    Komal Bhandakkar AUTHOR
    Added an answer on September 2, 2020 at 9:18 pm

    Dear students, Definition : High rise building is that type of building which is taller than 15m height which people can willing to walk up and it also requires mechanically operated vertical Transportation systems. No. of Floors in high rise building= greater than four (i.e. G + 3 Floors) ElectricaRead more

    Dear students,

    Definition :

    High rise building is that type of building which is taller than 15m height which people can willing to walk up and it also requires mechanically operated vertical Transportation systems.

    No. of Floors in high rise building= greater than four (i.e. G + 3 Floors)

    Electrical system :

    The electrical system provided in high rise building depends on the utility of that building.

    High Voltage wire is required for commercial building and it is considered hazardous.

    The machine has its own fuse, there will be wire ways included in the floor slab.

    Various types of electrical works carried out in high rise building:

    • Fixing a standby diesel generator
    • Each consumer has to be protected by a provision of an Earth leakage circuit breaker(ELCB)  to safeguard the persons against electrical shocks.
    • All power sockets need to be earthed through an earth conductor and finally connected to ground pits.
    • Solar power for high rise building is essential to fulfilling all requirements and reduces electricity consumption.
    • Enhances energy conservation
    • New technology:

                  integrated building                      management system(IBMS)

    1. Can monitor and control fire.
    2. It has a security module for access control
    3. Elevator control
    See less
    • 38
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 1 1 Answer
  • 108 Views
  • 0 Followers
Asked: July 3, 2020In: Miscellaneous

What is Out-Turn Work in Quantity Surveying?

Ancy Joby
Ancy Joby

Ancy Joby

  • 20 Questions
  • 11 Answers
  • 1 Best Answer
  • 580 Points
View Profile
Ancy Joby Learner

What is out-turn work in quantity surveying?

  1. Soumyadeep Halder

    Soumyadeep Halder

    • 0 Questions
    • 29 Answers
    • 2 Best Answers
    • 57 Points
    View Profile
    Soumyadeep Halder User
    Added an answer on July 4, 2020 at 12:06 am

    The capacity of doing work by an artisan or skilled labour in the form of quantity of work per day is known as the task work or out turn of the labour. The out-turn of work per artisan varies to some extent according to the nature, size, height, situation, location, etc., In bigger cities where specRead more

    The capacity of doing work by an artisan or skilled labour in the form of quantity of work per day is known as the task work or out turn of the labour.

    The out-turn of work per artisan varies to some extent according to the nature, size, height, situation, location, etc., In bigger cities where specialized and experienced labour is available the out-turn is greater than small towns and country sides.  In well organized work less labour is required.

    See less
    • 3
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 1 1 Answer
  • 635 Views
  • 0 Followers
Asked: June 20, 2020In: Miscellaneous

What are the Causes of a Structure Collapse?

Rohan Chaugule
Rohan Chaugule

Rohan Chaugule

  • 12 Questions
  • 11 Answers
  • 1 Best Answer
  • 1,045 Points
View Profile
Rohan Chaugule Expert

What are the causes of a structure collapse?

  1. Atta Ur Rehman

    Atta Ur Rehman

    • 0 Questions
    • 1 Answer
    • 0 Best Answers
    • 25 Points
    View Profile
    Atta Ur Rehman User
    Added an answer on June 22, 2020 at 4:44 pm

    Following are the five major reasons of structural collapse: 1. The foundations are too weak Adequate foundations can be costly. They can cost up to half the price of a building, observes professor of civil engineering Anthony Ede at Covenant University in Ota, Nigeria. He says two things should beRead more

    Following are the five major reasons of structural collapse:

    1. The foundations are too weak

    Adequate foundations can be costly.

    They can cost up to half the price of a building, observes professor of civil engineering Anthony Ede at Covenant University in Ota, Nigeria.

    He says two things should be considered when you are building the foundations – the solidity of the soil and the heaviness of the building and its contents.

    In the commercial capital of his country, Lagos, the swampy ground requires strong foundations. Far stronger than solid ground.

    But he says developers save money that should be spent on foundations when building on the city’s swampy ground and many buildings have collapsed in Lagos as a result.

    Even on solid ground, foundations need to be strong enough for the load.

    Inadequate foundations for a four-storey building was one of three reasons given by investigators for a building collapsing in northern Rwanda in 2013 and killing six people.

    2. The building materials aren’t strong enough

    Materials that just aren’t strong enough to withhold the load are used, says Hermogene Nsengimana from the African Organization for Standardisation, whose organisation met last month in Nairobi to discuss why so many African buildings collapse.

    He suggests there is a market for counterfeit materials – going as far as to say that sometimes scrap metal is used instead of steel.

    When a six-storey building in Uganda’s capital Kampala collapsed in April, the director of the city authority suggested it had been constructed with counterfeit materials, reports Ugo news site .

    Mr Nsengimana says there are even cases of counterfeiters faking authentification certificates.

    But he suggests contractors also knowingly use the incorrect materials to cut costs.

    So they may use concrete intended to bear the load of a one-storey building in a four-storey building.

    Mr Ede adds that this is something regulators are not policing.

    3. Workers make mistakes

    Even when workers are given the right materials to make the concrete, they mix them incorrectly, says Mr Ede.

    This results in concrete which is not of the sufficient strength to hold the load.

    He accuses developers of cutting costs by employing unskilled workers who are cheaper than trained builders.

    This is one of the reasons put forward by civil engineers Henry Mwanaki Alinaitwe and Stephen Ekolu why a building in Uganda collapsed in 2004.

    Their research shows that the workers misunderstood the mixing ratios of the concrete.

    It suggested that people used wheelbarrows instead of measuring gauges to measure cement.

    The five-storey BBJ new hotel collapsed in construction and 11 people died.

    “You find bricklayers and even technicians calling themselves engineers,” cautions the president of the Nigerian Institution of Structural Engineers Oreoluwa Fadayomi in Nigeria’s The Punch news site.

    To those who want to save money on professionals, he advises: “One should not be penny wise and pound foolish”.

    4. The load is heavier than expected

    Mr Ede says a building collapses when the load is beyond the strength of the building.

    He gives the example of asking a baby to carry a heavy box: “The baby will not be able to withhold the strain.”

    Even if the foundations and the materials are strong enough for what they were originally built for, that purpose may change.

    So, Mr Ede says, if a building was designed to be a home and is then turned into a library where boxes and boxes of books are piled up, the building may strain under the weight.

    He says another reason why the load is often heavier than the original design is because extra storeys are added.

    In March an upmarket apartment block which had more storeys than planned collapsed in Lagos, killing 34 people the Guardian reported.

    This came two years after a church accommodation for the famous preacher TB Joshua collapsed, also, authorities said, because it had more floors than it could hold . In that case more than 100 people lost their lives.

    5. The strength isn’t tested

    At all points of construction the strength of the building should be tested, says Mr Ede.

    “You have to be strict,” he says, about policing building.

    “The law says you must test. It’s the enforcement of the law which is the problem,” he says.

    That’s a big problem, he says, when at every stage of construction there is someone with a strong motivation to save money or take money.

    There are many physical reasons a building can collapse but only one driving motivation for that to happen, says Mr Ede. That’s money.

    And for him this is the real reason buildings collapse – corruption.

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 1 1 Answer
  • 175 Views
  • 0 Followers
Asked: July 4, 2020In: Miscellaneous

What is the Cadastral Survey in Surveying?

Shivan
Shivan

Shivan

  • 9 Questions
  • 0 Answers
  • 0 Best Answers
  • 56 Points
View Profile
Shivan User

What is the Cadastral Survey in Surveying?

  1. Ancy Joby

    Ancy Joby

    • 20 Questions
    • 11 Answers
    • 1 Best Answer
    • 580 Points
    View Profile
    Ancy Joby Learner
    Added an answer on July 5, 2020 at 10:50 am

    Cadastral survey is a comprehensive study of land, its location, its value, etc. A cadastral survey shows the extent, boundaries, value, and ownership of land. Through these surveys, authorities assign a numerical identity to land.

    Cadastral survey is a comprehensive study of land, its location, its value, etc. A cadastral survey shows the extent, boundaries, value, and ownership of land. Through these surveys, authorities assign a numerical identity to land.

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 3 3 Answers
  • 313 Views
  • 0 Followers
Asked: October 26, 2017In: Miscellaneous

I need general method statement for building works G+2

Gopal Mishra
Gopal Mishra

Gopal Mishra

  • 70 Questions
  • 44 Answers
  • 7 Best Answers
  • 577 Points
View Profile
Gopal Mishra

Please send me general method statement with complete documents like risk assessments

  1. Omprakash Dhawale

    Omprakash Dhawale

    • 0 Questions
    • 15 Answers
    • 0 Best Answers
    • 383 Points
    View Profile
    Omprakash Dhawale Beginner
    Added an answer on October 3, 2020 at 12:03 pm
    This answer was edited.

    Sir, The construction workers can build, repair, maintain, renovate, modify and demolish houses, offices, temples, hospitals,bridges, tunnels, stadiums and airports. The International Labour Organization(ILO) classifies the construction industry as government and private sector.   Following are consRead more

    Sir, The construction workers can build, repair, maintain, renovate, modify and demolish houses, offices, temples, hospitals,bridges, tunnels, stadiums and airports. The International Labour Organization(ILO) classifies the construction industry as government and private sector.  

    Following are construction occupants1:

    • Boilermakers
    • Bricklayers
    • Concrete finishers
    • Masons

     

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 1 1 Answer
  • 944 Views
  • 0 Followers
Asked: July 10, 2020In: Miscellaneous

How to make a home plan, step by step?

RaghavArora
RaghavArora

RaghavArora

  • 4 Questions
  • 5 Answers
  • 1 Best Answer
  • 847 Points
View Profile
RaghavArora Learner

How to make a home plan, step by step?

  1. Suyogmuralkar

    Suyogmuralkar

    • 1 Question
    • 11 Answers
    • 0 Best Answers
    • 303 Points
    View Profile
    Suyogmuralkar Beginner
    Added an answer on August 21, 2020 at 1:30 pm

    Hi Raghav,For making any structure there is need to understand the need of the user. All things are planned accordingly to the need of user. There are various things which are taken into consideration before planning any structures are listed below as follows: Selection of suitable land for construcRead more

    Hi Raghav,For making any structure there is need to understand the need of the user.

    All things are planned accordingly to the need of user. There are various things which are taken into consideration before planning any structures are listed below as follows:

    1. Selection of suitable land for construction.
    2. Understanding the plot area and budget which owner can afford to make his home
    3. Understanding demands of owner may include his preferences, choices and his vision for his dream home. Then it is advised to visited a certified architect
    4. Then after making suitable plan from architect it’s advised to visit a structural engineer for execution of plan.
    5. A final submission plan form architect needs to be approved by the local authority like municipal corporations and municipal councils.
    6. It’s time to get an experienced contractor for ground level construction.
    See less
    • 1
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 1 1 Answer
  • 228 Views
  • 0 Followers
Load More Questions

Sidebar

Popular Articles

  • Gopal Mishra

    Types of Foundation for Buildings and their Uses [PDF]

  • Gopal Mishra

    Compressive Strength of Concrete -Cube Test [PDF], Procedure, Results

  • Padmanabhan G

    Methods of Rainwater Harvesting [PDF]: Components, Transport, and Storage

  • Sadanandam Anupoju

    16 Types of Heavy Equipment Used in Construction

  • Fasi Ur Rahman

    Standard Size of Rooms in Residential Building and their Locations

Recent Articles

  • Xian

    Bricklaying Robots in Construction #2

  • Xian

    Welcome to the Gutenberg Editor

  • Xian

    Bricklaying Robots in Construction

  • Ravi Panwar

    Rongjiang Bridge: The World’s Longest Bridge of Rigid Girder and Flexible Arch

  • Ravi Panwar

    Qinghai–Tibet Railway: The Longest and Highest Highland Railway in the World

Recent Questions

  • Shailendra

    In what case is a Shear Key provided in Foundation?

    • 0 Answers
  • Salman

    What is piping technology for termite treatment in building?

    • 0 Answers
  • nikeetasharma

    Which instrument is widely used for surveying?

    • 1 Answer
  • nikeetasharma

    Which type of reinforcement are used in pre-stressing?

    • 0 Answers
  • Bhavani Pesaru

    How can we use magnetic levitation method in civil engineering?

    • 0 Answers

Explore

  • Questions
    • Popular Questions
    • Trending Questions
    • New Questions
    • No Answer Questions
  • Ask Questions
  • Write for us
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Home
  • About Us
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.