Rate analysis for block size 30cmx20cmx15cm with mortar ratio of 1:2:4 including labour cost
Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.
Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.
Lost your password? Please enter your email address. You will receive a link and will create a new password via email.
jkshah
Are you asking for The rate of Concrete block or The rate of different items like cement, sand, aggregate?
Komal Bhandakkar
Rate analysis of concrete block:
Important points :
Tools for cement mortar and Labour estimation :
Important note :
Very high charges for the mechanical mixer is to be taken in in a lump sum for mixing 1-metre cube of mortar.
Thank You.
Komal Bhandakkar
Rate analysis:
Rate analysis will simply the quantity of cement and sand required for the 1-meter cube of cement sand mortar.
Similarly, we can do rate analysis for concrete as well for different proportions.
Here I am discussing point example of the material required for the 1-meter cube of cement concrete of density 2.3 ton per metre cube and cement sand aggregate ratio is 1:3: 6
Mix proportion ratio is 1:3:6 (here, maximum 20 nominal sizes of aggregates are used.)
The total sum is 1+ 3 + 6=10 Dry volume of 1-metre cube concrete is a 1.54-metre cube.
Hence cement required is a one-tenth part of the 1.54-meter cube which is 0.15-metre cube means to 16 kg means 4.3 bags of 50 kg each.
If you want to find out the sand quantity then it’s 0.46-meter cube means 1.2-ton Aggregate quantity 0.92-metre cube means 1.56 ton of maximum normal size of 20 mm aggregate
I hope so your doubt is clear, thank you.