Join

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Log in
Continue with Facebook
Continue with Google
or use


Have an account? Log in Now

Log in

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Join Here

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Join Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Log in Now

Sorry, you do not have permission to ask a question, You must login to ask question. Become VIP Member

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Join Here
Become VIP Member
The Constructor Logo The Constructor Logo
Log inJoin

The Constructor

The Constructor Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write Article
  • Questions
    • Recent Questions
    • Popular Questions
    • Polls
    • Ask a Question
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital tools
    • Geotechnical
      • Foundation
Search
VIP Dashboard

Mobile menu

Close
Ask a Question
  • Questions
    • Popular Questions
    • Trending Questions
    • New Questions
    • No Answer Questions
  • Ask Questions
  • Write for us
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

When should we opt for continuous footing?

Home/ Questions/Q 40601
Next
In Process

Do you need to remove the ads? Become VIP Member

Asked: May 14, 20202020-05-14T19:26:55+05:30 2020-05-14T19:26:55+05:30In: Foundation
kheiro brahim
kheiro brahim

kheiro brahim

  • 1 Question
  • 0 Answers
  • 0 Best Answers
  • 5 Points
View Profile
kheiro brahim User

When should we opt for continuous footing?

  • 0
  • 5 5 Answers
  • 634 Views
  • 0 Followers
  • 0
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

5 Answers

  • Voted
  • Oldest
  • Recent
  1. AdityaBhandakkar

    AdityaBhandakkar

    • 11 Questions
    • 250 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    2020-08-01T22:40:42+05:30Added an answer on August 1, 2020 at 10:40 pm
    When should we opt for continuous footing?

    The continuous footing is provided to supports more than two columns.

    It is analogous to strip footing used to support walls. It transfers loads to beams and then beams to ground.

    Continuous wall footing supports RCC wall and long masonry effectively.

    Following are some other types of footing;

    1. Isolated footing
    2. Raft footing
    3. Strap footing
    4. Pile footing
    5. Combined footing

     

     

    • 39
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  2. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    2020-10-29T17:57:37+05:30Added an answer on October 29, 2020 at 5:57 pm

    A continuous footing is the one which supports more than two columns. This footing is also called as strip footing and is analogous to the strip footing for wall. The loads from the individual columns are transferred either directly to the footing slab, or through a longitudinal beam running longitudinally when the loads are heavy.

    • 17
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  3. Komal Bhandakkar

    Komal Bhandakkar

    • 46 Questions
    • 255 Answers
    • 0 Best Answers
    • 2,040 Points
    View Profile
    Komal Bhandakkar AUTHOR
    2020-10-28T23:13:08+05:30Added an answer on October 28, 2020 at 11:13 pm
    When should we opt for continuous footing?

    Continuous Footing:

    The continuous footing is also called as strip footing.


    Strip footing sir commonly used as foundations of load-bearing walls.


    The footing usually has advised fitting as load-bearing wall and sometimes it is even wider than that.


    The width, as well as the type of reinforcement, are depending on the bearing capacity of the foundation soil.


    The continuous footing is a type of Shallow Foundation which supports more than two columns.


    The continuous footing is used where the soil has good bearing capacity to resist load occurrence on the structure.


    Thank you.

     

     

    • 13
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  4. Gopal Mishra

    Gopal Mishra

    • 70 Questions
    • 44 Answers
    • 7 Best Answers
    • 577 Points
    View Profile
    Gopal Mishra
    2020-05-14T19:30:36+05:30Added an answer on May 14, 2020 at 7:30 pm

    Continuous footing is used under walls and where the spacing between two individual footing is very small or they overlap.

    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  5. Madeh Izat Hamakareem

    Madeh Izat Hamakareem

    • 0 Questions
    • 40 Answers
    • 3 Best Answers
    • 1,229 Points
    View Profile
    Madeh Izat Hamakareem EDITOR
    2020-05-15T04:13:53+05:30Added an answer on May 15, 2020 at 4:13 am

    A continuous footing, which is also called strip footing or wall footing, is used to support walls along their length. Sufficient overhangs are provided to ensure adequate footing bearing area.
    Continuous footing is usually placed concentrically beneath walls. However, when a wall is adjacent to a property line,  a continuous footing that is eccentric on one side would be required.

    To analyze and design reinforced concrete wall footing based on ACI 318-19, please visit the following link:

    https://test.theconstructor.org/geotechnical/analysis-design-wall-footing/38457/

    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp

You must login to add an answer.

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Need An Account, Join Here

Sidebar

Popular Articles

  • Gopal Mishra

    Types of Foundation for Buildings and their Uses [PDF]

  • Gopal Mishra

    Compressive Strength of Concrete -Cube Test [PDF], Procedure, Results

  • Padmanabhan G

    Methods of Rainwater Harvesting [PDF]: Components, Transport, and Storage

  • Sadanandam Anupoju

    16 Types of Heavy Equipment Used in Construction

  • Fasi Ur Rahman

    Standard Size of Rooms in Residential Building and their Locations

Recent Articles

  • Xian

    Bricklaying Robots in Construction #2

  • Xian

    Welcome to the Gutenberg Editor

  • Xian

    Bricklaying Robots in Construction

  • Ravi Panwar

    Rongjiang Bridge: The World’s Longest Bridge of Rigid Girder and Flexible Arch

  • Ravi Panwar

    Qinghai–Tibet Railway: The Longest and Highest Highland Railway in the World

Recent Questions

  • Shailendra

    In what case is a Shear Key provided in Foundation?

    • 0 Answers
  • Salman

    What is piping technology for termite treatment in building?

    • 0 Answers
  • nikeetasharma

    Which instrument is widely used for surveying?

    • 1 Answer
  • nikeetasharma

    Which type of reinforcement are used in pre-stressing?

    • 0 Answers
  • Bhavani Pesaru

    How can we use magnetic levitation method in civil engineering?

    • 0 Answers

Explore

  • Questions
    • Popular Questions
    • Trending Questions
    • New Questions
    • No Answer Questions
  • Ask Questions
  • Write for us
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Home
  • About Us
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.