As we know 1:2:4 ratio is for M15 concrete. Generally Water quantity is calculated as per below formula: Water Quantity=W/C ratio*Cement Quantity Generally W/C ratio is lays between 0.4 to 0.6 as per IS 10262(2009). Now first we have to assume cement quantity, so let's assume cement quantity=50 KG aRead more
As we know 1:2:4 ratio is for M15 concrete. Generally Water quantity is calculated as per below formula:
Water Quantity=W/C ratio*Cement Quantity
Generally W/C ratio is lays between 0.4 to 0.6 as per IS 10262(2009).
Now first we have to assume cement quantity, so let’s assume cement quantity=50 KG and W/C ratio=0.5
Now let’s calculate water quantity for 50 KG cement.
Water Quantity=0.5*50=25 liter.