Join

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Log in
Continue with Facebook
Continue with Google
or use


Have an account? Log in Now

Log in

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Join Here

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Join Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Log in Now

Sorry, you do not have permission to ask a question, You must login to ask question. Become VIP Member

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Join Here
Become VIP Member
The Constructor Logo The Constructor Logo
Log inJoin

The Constructor

The Constructor Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write Article
  • Questions
    • Recent Questions
    • Popular Questions
    • Polls
    • Ask a Question
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital tools
    • Geotechnical
      • Foundation
Search
VIP Dashboard

Mobile menu

Close
Ask a Question
  • Questions
    • Popular Questions
    • Trending Questions
    • New Questions
    • No Answer Questions
  • Ask Questions
  • Write for us
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

How to Calculate Rate Analysis For Concrete 1:2:4?

Home/ Questions/Q 37931
Next
In Process

Do you need to remove the ads? Become VIP Member

Asked: February 12, 20202020-02-12T18:34:47+05:30 2020-02-12T18:34:47+05:30In: Concrete
c
c

c

  • 1 Question
  • 0 Answers
  • 0 Best Answers
  • 0 Points
View Profile
c User

Do we calculate wastage for Cement, 20mm and coarse aggregate in rate analysis for concrete?

  • 1
  • 4 4 Answers
  • 274 Views
  • 0 Followers
  • 0
  • Share
    Share
    • Share on Facebook
    • Share on Twitter
    • Share on LinkedIn
    • Share on WhatsApp

4 Answers

  • Voted
  • Oldest
  • Recent
  1. Gopal Mishra

    Gopal Mishra

    • 70 Questions
    • 44 Answers
    • 7 Best Answers
    • 577 Points
    View Profile
    Gopal Mishra
    2020-02-12T18:37:31+05:30Added an answer on February 12, 2020 at 6:37 pm

    Wastage occurs in case of steel reinforcement in concrete construction. Since cement, sand and coarse aggregates are measured and then used as per required quantity based on mix ratio, their wastage does not occur. Steel reinforcement are of specific length and they need to be cut as per drawing. So, some small pieces may remain unused, which is considered as wastage.

    • 1
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  2. poojan

    poojan

    • 5 Questions
    • 14 Answers
    • 1 Best Answer
    • 604 Points
    View Profile
    poojan Learner
    2020-05-13T21:40:14+05:30Added an answer on May 13, 2020 at 9:40 pm

    Material and cost needed for 10 Cu.m of concrete are mentioned below:

    Cement Sand Aggregate 20mm
    1 2 4 Ratio of cement
    Total 7 =1+2+4
    For 10 cu.m
    Considering wastage in concrete(7%) 10.7
    Shrinkage factor 1.52
    Dry concrete 16.264 =10.7*1.52
    Description Cement Sand Aggregate
    Calculation =(1/7)*10.7 =(2/7)*10.7 =(4/7)*10.7
    Cu.m quantity needed 1.53 3.06 6.11
    Wastage 2% considered 10% considered 5% considered
    Total Cu.m Needed 1.56 3.37 6.42
    Bags = 1.56/0.0345
    Total Quantity 45.21 Bags 3.37 cu.m sand 6.42 cu.m aggregate

     

    • Now multiply with the rates of the material
    • Add the rate of a skilled and unskilled worker
    • Water and electricity may be considered:: 2% x (Total cost of the worker + Total cost of material)
    • TEP cost may be considered 1% x (Total cost of the worker + Total cost of materials) and also add the owning and operating cost of required machinery
    • Profit and overhead cost will be as per decided

    The total cost will be addition of above all for 10 Cu.m

     

    • 1
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  3. Komal Bhandakkar

    Komal Bhandakkar

    • 46 Questions
    • 255 Answers
    • 0 Best Answers
    • 2,040 Points
    View Profile
    Komal Bhandakkar AUTHOR
    2020-10-07T20:08:56+05:30Added an answer on October 7, 2020 at 8:08 pm
    This answer was edited.

    Rate analysis:

    Basically rate analysis is simply a summary of all the cost which is at fault in doing a particular work. For the great analysis, we should be aware of the details about the operation involved in carrying out the work. We should consider the following parameter in mind while doing rate analysis:

    1. Material quantity and cost of it
    2. Cost of labor
    3. Equipment cost (usually it is considered 1.5%)
    4. Water charges (Again will consider it as 1.5 %)
    5. Overhead expenses (it range from 2 to 5%)
    6. Profit of contractor (it is taken as 10%)

    Total material cost:

    Here I am doing the total material cost calculation for the 1-meter cube of concrete of ratio 1:2:4

    Cement = 1.57/(1+2+4) = 1.57/7 =0.22cum x 28.8 = 6.336 bags.

    Sand = 0.22 x 2 = 0.44 cum

    Aggregate = 0.22 x 4 = 0.88 cum

    Cement = 6.336 bags @300Ru.= 1900.8

    Aggregate = 0.88 cum @800 per cum

    Total Material Cost = 1900.8 + 440 + 704 = 3044.8


    I hope so you found my answer helpful.

    Thank you.

    • 29
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  4. AdityaBhandakkar

    AdityaBhandakkar

    • 11 Questions
    • 250 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    2020-10-19T07:59:24+05:30Added an answer on October 19, 2020 at 7:59 am
    This answer was edited.

    Hi,

    Please specify the type of wastage you would like to reduce. Because cement sand and aggregate are measured at the initial stage and then for the mix for making a concrete paste. So if mix ratio is correct then there is no probability of wastage of these materials. In some cases, if the mix ratio is not proper then more amount of concrete test it is made by the labour which is considered as the waste. But it depends upon is site engineer and mix ratio. Steel reinforcement is also used in construction, which manufactured in proper length. Thus, some small parts remain in used and considered as waste.

    Hope you get the answer.

    • 33
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp

You must login to add an answer.

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Need An Account, Join Here

Sidebar

Popular Articles

  • Gopal Mishra

    Types of Foundation for Buildings and their Uses [PDF]

  • Gopal Mishra

    Compressive Strength of Concrete -Cube Test [PDF], Procedure, Results

  • Padmanabhan G

    Methods of Rainwater Harvesting [PDF]: Components, Transport, and Storage

  • Sadanandam Anupoju

    16 Types of Heavy Equipment Used in Construction

  • Fasi Ur Rahman

    Standard Size of Rooms in Residential Building and their Locations

Recent Articles

  • Xian

    Bricklaying Robots in Construction #2

  • Xian

    Welcome to the Gutenberg Editor

  • Xian

    Bricklaying Robots in Construction

  • Ravi Panwar

    Rongjiang Bridge: The World’s Longest Bridge of Rigid Girder and Flexible Arch

  • Ravi Panwar

    Qinghai–Tibet Railway: The Longest and Highest Highland Railway in the World

Recent Questions

  • Shailendra

    In what case is a Shear Key provided in Foundation?

    • 0 Answers
  • Salman

    What is piping technology for termite treatment in building?

    • 0 Answers
  • nikeetasharma

    Which instrument is widely used for surveying?

    • 1 Answer
  • nikeetasharma

    Which type of reinforcement are used in pre-stressing?

    • 0 Answers
  • Bhavani Pesaru

    How can we use magnetic levitation method in civil engineering?

    • 0 Answers

Explore

  • Questions
    • Popular Questions
    • Trending Questions
    • New Questions
    • No Answer Questions
  • Ask Questions
  • Write for us
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Home
  • About Us
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.