Which softwares can be used for estimation of construction project time and quantity?
Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.
Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.
Lost your password? Please enter your email address. You will receive a link and will create a new password via email.
Primavera P6
MS Project 2010 or Building Estimation and Costing
ms project and primavera are the most renowned however there are many softwares to optimize project duration
AMK
Beside using Ms project or primavera,Using Autodesk Revit with Autodesk mavis work will help you show not only the amount of time and money needed but also the construction sequencing with the amount of time and manpower needed for the construction process.
Biranjan Kumar
MS PROJECT 2010
poojan
Time Estimation: Actually there are many Softwares out there in the market but the most commonly used in the Indian market are Primavera and MS project for Scheduling and estimation of time required, but the software is not limited to this two, there are many like TILOS which is used widely in Europe, it is more useful for estimation of linear projects like metro and roads.
Quantity: In most of the companies the quantity estimation is done in Excel, but there is much other software for quantity estimation, the most common are Revit and Tekla, from which you can directly model your project and take off quantities.
Abhishek Kirave
There are many software’s that are used for the estimation purpose, namely-
vsandeep577@gmail.com
For Project Planning & scheduling ,Time line & approximate Budget of project we can use Microsoft project and Primavera p6.
Rohan Chaugule
The following software are used for estimation and quantity calculation:
Auto desk quantity takeoff
Auto desk Revit
Microsoft excel
Tekla Tilos
Microsoft’s Project
Primavera
Candy.
CostX.
Sage Estimating.
B2W Estimate.
HCSS Heavy bid.
ProEst Estimating software.
Stack.
On-Screen Takeoff
Mangala Karunarathne
We can use software like Microsoft Project, Primavera or similar software to estimate the project duration. But you need to have a better understanding of the project management concepts to come across with effective time estimation.
Atiullah
MS project 2010
dhiraj010kumar
You Can Have Your Answer in this Article, Please Go through It.
https://test.theconstructor.org/construction/top-estimation-software-construction-industry/30679/
raqheeb ahmed
For the estimation of the project, we need to have CAD drawings opened and simultaneously open XL program. Observe the actual dimensions in Drawing and put in the XL sheet. Feed formulas in xl sheet as per your requirement. For example, concrete values we need cubic units and plastering we need only square units. Go on collecting information from CAD and put in XL sheets.
Structural Engineer
Primavera P6
Primavera P6 is the standard project management software tool used worldwide in industries such as Construction, Oil & Gas, Manufacturing, Energy and even IT. While there are lots of project management tools on the market, Primavera P6 shines in being able to manage large and complex projects and to do it well.
Learning Primavera P6 can have advantages and even lead to a great career in project planning & scheduling. Read-on and learn about about how you can succeed with Primavera P6.
Ajinkya Morey
From my point of view, MS-Project is the best from all other software it gives you a user-friendly interface and easy accessibility
Patch_ SE
Autodesk NavisWorks
vinitkumarssm
You can use any BIM (Building Information Modelling) software for quantities take-off. this will give you very precise results. and this is also a very demanding field to work. the software you can use is Autocad, Revit, Tekla, Slack, etc these are very informative software if you need to just get an idea of the quantity, you can use Autocad only.
Ther are other software like CANDY which is dedicated to estimation and quantity survey.
Coming to Time estimation, there are many project management software that can be used for it the most popular one is MS Project, Primavera P6. If you want an online software you can use Zoho Projects.
AdityaBhandakkar
BIM (Building information modeling) is
Good software for quantity management.
MS PROJECT and PRIMAVERA P6 are the globally accepted software by professionals.
An online alternative to this software is the ZOHO project, which also gives realistic results.
Some software is as follows:
aviratdhodare
MS project 2010
Primavera P6
Autodesk NavisWorks
Clear Estimates
On-Screen Takeoff
Sage Estimating
BIM (Building information modeling)
Candy
B2W Estimate
CostX
Autodesk Quantity takeoff
Tekla
Revit
Zoho Projects
HCSS HeavyBid
Autodesk quantity takeoff , ms project and primavera P6 were the softwares used majorly in estimation
sufiyansolanki
Primavera is a Project Management Software, but it cannot be learned effectively by a fresher most of the time. Microsoft Project is also used in Project Management. It also has the same story.
The suggestion that I would give to fresher students is that they must visit a site or do some internship before you learn this software. These types of software can be learned from professionals and are costly. That is why when someone enrolls in learning this software, they should do it in a very effective and efficient manner.
Himal Fernando
Microsoft Project and Primavera P6. Primavera P6 provides more functionality.
sanjaypakad
BIM 360 and MS Projects 2010 are Top Construction Project Management Software
Komal Bhandakkar
Actually,
Some people tend to estimate rather than optimistically and some people tend to estimate rather pessimistically. This is is one of the most difficult questions to answer.
First, we have to split the whole project into requirements.
Then estimate each requirement by their level of difficulty to implement If you have a hard time deciding between any two numbers pick the bigger one.
ARSHI