Join

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Log in
Continue with Facebook
Continue with Google
or use


Have an account? Log in Now

Log in

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Join Here

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Join Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Log in Now

Sorry, you do not have permission to ask a question, You must login to ask question. Become VIP Member

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Join Here
Become VIP Member
The Constructor Logo The Constructor Logo
Log inJoin

The Constructor

The Constructor Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write Article
  • Questions
    • Recent Questions
    • Popular Questions
    • Polls
    • Ask a Question
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital tools
    • Geotechnical
      • Foundation
Search
VIP Dashboard

Mobile menu

Close
Ask a Question
  • Questions
    • Popular Questions
    • Trending Questions
    • New Questions
    • No Answer Questions
  • Ask Questions
  • Write for us
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Construction Site Related

Home/Construction Site Related/Page 11

Do you need to remove the ads? Become VIP Member

  • Recent Questions
  • Most Answered
  • Answers
  • No Answers
  • Most Visited
  • Most Voted
  • Random

Discy Latest Questions

Asked: June 22, 2020In: Construction Site Related

What is the Beam and Column Junction reinforcement details?

Anil Kumar
Anil Kumar

Anil Kumar

  • 1 Question
  • 0 Answers
  • 0 Best Answers
  • 7 Points
View Profile
Anil Kumar User

What is the Beam and Column Junction reinforcement details?

  1. AdityaBhandakkar

    AdityaBhandakkar

    • 11 Questions
    • 250 Answers
    • 2 Best Answers
    • 0 Points
    View Profile
    AdityaBhandakkar User
    Added an answer on October 6, 2020 at 2:45 pm
    This answer was edited.
    What is the Beam and Column Junction reinforcement details?

    Hi, In simple words, detailing of composed mint is necessary for the structural steel and also for 10 force concrete structures to attend strength and durability. The figure is attached with shows the joining details of beams and columns. The main parts of them should be cracked near the columns andRead more

    Hi,

    In simple words, detailing of composed mint is necessary for the structural steel and also for 10 force concrete structures to attend strength and durability. The figure is attached with shows the joining details of beams and columns.

    The main parts of them should be cracked near the columns and the length. It is in the ratio of 1:4. Any other cases the beam re pass must not pass from the column rebars outer surface which comprises the concrete cover.

    Instead of detailing the above different detailings are the wind for rehabilitation and strengthening the damaged elements.

    See less
    • 35
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 2
  • 3 3 Answers
  • 1,337 Views
  • 0 Followers
Asked: July 15, 2020In: Construction Site Related

What is the meaning of Defect Liability Period(DLP)?

fathima
fathima

fathima

  • 26 Questions
  • 10 Answers
  • 0 Best Answers
  • 377 Points
View Profile
fathima Beginner

What is the meaning of the defect liability period?

  1. Emmyvin

    Emmyvin

    • 3 Questions
    • 2 Answers
    • 0 Best Answers
    • 90 Points
    View Profile
    Emmyvin User
    Added an answer on July 24, 2020 at 5:40 pm

    Defect Liability period is a particular amount of time given to the contractor after the completion of a project to check if the project is delivered in good shape, whereby if any defects be detected, the contractor is to fix the defect for free during the defect liability period.

    Defect Liability period is a particular amount of time given to the contractor after the completion of a project to check if the project is delivered in good shape, whereby if any defects be detected, the contractor is to fix the defect for free during the defect liability period.

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 1
  • 1 1 Answer
  • 348 Views
  • 0 Followers
Asked: October 31, 2017In: Construction Site Related

Is a slab over a trapezoidal cross drain stable or not for a road of width 7m in rural roads?

Gopal Mishra
Gopal Mishra

Gopal Mishra

  • 70 Questions
  • 44 Answers
  • 7 Best Answers
  • 577 Points
View Profile
Gopal Mishra

Can a slab over a trapezoidal cross drain with slope of 1:3 be placed and whether the slab will be stable for road

  1. Omprakash Dhawale

    Omprakash Dhawale

    • 0 Questions
    • 15 Answers
    • 0 Best Answers
    • 383 Points
    View Profile
    Omprakash Dhawale Beginner
    Added an answer on October 3, 2020 at 11:55 am
    This answer was edited.

    Sir, Basically slope morphology impacts road drainage and ultimately road stability. Therefore we can placed culvert in each draw. Side slope for rural road where embankment height is less than 3m should be 1:3  

    Sir, Basically slope morphology impacts road drainage and ultimately road stability. Therefore we can placed culvert in each draw. Side slope for rural road where embankment height is less than 3m should be 1:3  

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 1 1 Answer
  • 588 Views
  • 0 Followers
Asked: July 27, 2020In: Construction Site Related

Why is propping required for long structures once the formwork is removed?

DevilAVRT
DevilAVRT

DevilAVRT

  • 27 Questions
  • 49 Answers
  • 3 Best Answers
  • 207 Points
View Profile
DevilAVRT Beginner

Why is propping required for long structures once the formwork is removed?

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on November 12, 2020 at 8:09 pm

    When the sufficient strength is attained for the long span concrete structures to support their self weight, creep deflection may occur in these structures if propping is not provided after the removal of formwork. Hence repropping is carried out after removing formwork and thus these props should nRead more

    When the sufficient strength is attained for the long span concrete structures to support their self weight, creep deflection may occur in these structures if propping is not provided after the removal of formwork. Hence repropping is carried out after removing formwork and thus these props should not be allowed to stand too long because creep loads may overstress them.

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 5 5 Answers
  • 176 Views
  • 0 Followers
Asked: October 5, 2020In: Construction Site Related

Can we place a Column over Beam mid-span?

Deepak Subba
Deepak Subba

Deepak Subba

  • 1 Question
  • 1 Answer
  • 0 Best Answers
  • 30 Points
View Profile
Deepak Subba User

Sir, Can we place column in the clear span of a beam without mid column support as shown in the figure. I was ...

  1. aviratdhodare

    aviratdhodare

    • 37 Questions
    • 252 Answers
    • 0 Best Answers
    • 480 Points
    View Profile
    aviratdhodare
    Added an answer on October 17, 2020 at 5:17 pm

    Yes, you can do that. These are called hung columns. These are columns, having no foundation/ footing, rest over beams, or slabs. These are also termed as hanging columns/ floating column. They can not transfer load directly to the foundation or footing. Load from these columns is the point load onRead more

    1. Yes, you can do that. These are called hung columns. These are columns, having no foundation/ footing, rest over beams, or slabs. These are also termed as hanging columns/ floating column.
    2. They can not transfer load directly to the foundation or footing. Load from these columns is the point load on the beam over which it rests.These beams are generally deep beam need high percentage of reinforcement, also termed as transfer beam. Load is transferred through the transfer beam to the supporting columns, ultimately to the foundation.
    3. These columns are designed to take vertical load , considering it a compression member.
    4. These are abundantly provided to get more space in the ground floor to keep provisions for parking, conference hall, architectural requirement , banquet hall in hotels, commercial building etc.These are also provided in intermediate floor for the similar purpose.
    5. These columns are designed for vertical load only. In earthquake prone areas these may prove unsafe. If at all provided, they will not take lateral forces, all seismic forces shall be taken by the main columns supporting the transfer beam.
    6. Reinforcement detailing is an important issue in the design of column- beam junction.
    See less
    • 5
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 4 4 Answers
  • 562 Views
  • 0 Followers

Sidebar

Popular Articles

  • Gopal Mishra

    Types of Foundation for Buildings and their Uses [PDF]

  • Gopal Mishra

    Compressive Strength of Concrete -Cube Test [PDF], Procedure, Results

  • Padmanabhan G

    Methods of Rainwater Harvesting [PDF]: Components, Transport, and Storage

  • Sadanandam Anupoju

    16 Types of Heavy Equipment Used in Construction

  • Fasi Ur Rahman

    Standard Size of Rooms in Residential Building and their Locations

Recent Articles

  • Xian

    Bricklaying Robots in Construction #2

  • Xian

    Welcome to the Gutenberg Editor

  • Xian

    Bricklaying Robots in Construction

  • Ravi Panwar

    Rongjiang Bridge: The World’s Longest Bridge of Rigid Girder and Flexible Arch

  • Ravi Panwar

    Qinghai–Tibet Railway: The Longest and Highest Highland Railway in the World

Recent Questions

  • Shailendra

    In what case is a Shear Key provided in Foundation?

    • 0 Answers
  • Salman

    What is piping technology for termite treatment in building?

    • 0 Answers
  • nikeetasharma

    Which instrument is widely used for surveying?

    • 1 Answer
  • nikeetasharma

    Which type of reinforcement are used in pre-stressing?

    • 0 Answers
  • Bhavani Pesaru

    How can we use magnetic levitation method in civil engineering?

    • 0 Answers

Explore

  • Questions
    • Popular Questions
    • Trending Questions
    • New Questions
    • No Answer Questions
  • Ask Questions
  • Write for us
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Home
  • About Us
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.