Join

Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.

Have an account? Log in
Continue with Facebook
Continue with Google
or use


Have an account? Log in Now

Log in

Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.

Join Here

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Join Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Log in Now

Sorry, you do not have permission to ask a question, You must login to ask question. Become VIP Member

Join for free or log in to continue reading...

Continue with Facebook
Continue with Google
or use


Forgot Password?

Don't have account, Join Here
Become VIP Member
The Constructor Logo The Constructor Logo
Log inJoin

The Constructor

The Constructor Navigation

  • Articles
    • Recent Articles
    • Popular Articles
    • Write Article
  • Questions
    • Recent Questions
    • Popular Questions
    • Polls
    • Ask a Question
  • Categories
    • How To Guide
      • Material Testing Guide
    • Concrete
    • Building
      • Brick Masonry
      • Building Materials
      • Building Tips
    • Construction
      • Equipments
      • Management
    • Digital tools
    • Geotechnical
      • Foundation
Search
VIP Dashboard

Mobile menu

Close
Ask a Question
  • Questions
    • Popular Questions
    • Trending Questions
    • New Questions
    • No Answer Questions
  • Ask Questions
  • Write for us
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Construction Site Related

Home/Construction Site Related/Page 2

Do you need to remove the ads? Become VIP Member

  • Recent Questions
  • Most Answered
  • Answers
  • No Answers
  • Most Visited
  • Most Voted
  • Random

Discy Latest Questions

Asked: July 27, 2020In: Construction Site Related

Why is propping required for long structures once the formwork is removed?

DevilAVRT
DevilAVRT

DevilAVRT

  • 27 Questions
  • 49 Answers
  • 3 Best Answers
  • 207 Points
View Profile
DevilAVRT Beginner

Why is propping required for long structures once the formwork is removed?

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on November 12, 2020 at 8:09 pm

    When the sufficient strength is attained for the long span concrete structures to support their self weight, creep deflection may occur in these structures if propping is not provided after the removal of formwork. Hence repropping is carried out after removing formwork and thus these props should nRead more

    When the sufficient strength is attained for the long span concrete structures to support their self weight, creep deflection may occur in these structures if propping is not provided after the removal of formwork. Hence repropping is carried out after removing formwork and thus these props should not be allowed to stand too long because creep loads may overstress them.

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 5 5 Answers
  • 181 Views
  • 0 Followers
Asked: June 29, 2020In: Construction Site Related

What are the advantages of using Plastic Formwork over Woodden Formwork?

Maulik vavaliya
Maulik vavaliya

Maulik vavaliya

  • 3 Questions
  • 1 Answer
  • 0 Best Answers
  • 43 Points
View Profile
Maulik vavaliya User

What are the advantages of using Plastic Formwork over Woodden Formwork?

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on October 6, 2020 at 5:06 pm

    There are many advantages of using plastic formwork over wooden formwork but the main advantage is we can handle plastic formwork very easily rather than handling wooden formwork because plastic formwork has light weight. Also plastic formwork is good resistant against water. And any type of complexRead more

    There are many advantages of using plastic formwork over wooden formwork but the main advantage is we can handle plastic formwork very easily rather than handling wooden formwork because plastic formwork has light weight. Also plastic formwork is good resistant against water. And any type of complex shaped structures can be prepared easily.

    See less
    • 32
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 5 5 Answers
  • 233 Views
  • 1 Follower
Asked: October 5, 2020In: Construction Site Related

Why Back Sight is also called as Plus Sight?

Komal Bhandakkar
Komal Bhandakkar

Komal Bhandakkar

  • 46 Questions
  • 255 Answers
  • 0 Best Answers
  • 2,040 Points
View Profile
Komal Bhandakkar AUTHOR

Why Back Sight is also called as Plus Sight?

  1. Komal Bhandakkar

    Komal Bhandakkar

    • 46 Questions
    • 255 Answers
    • 0 Best Answers
    • 2,040 Points
    View Profile
    Komal Bhandakkar AUTHOR
    Added an answer on November 17, 2020 at 5:50 pm
    This answer was edited.

    Back Sight: Backsight is simply a first reading which is taken after setting up the instrument.  Why the backsight is also called plus sight: Only because the reading is taken of known elevation to continue taking foresight reading.  Thank You.

    Back Sight: Backsight is simply a first reading which is taken after setting up the instrument. 


    Why the backsight is also called plus sight:

    Only because the reading is taken of known elevation to continue taking foresight reading. 


    Thank You.

    See less
    Attachment

    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 21
  • 5 5 Answers
  • 519 Views
  • 0 Followers
Asked: August 2, 2020In: Construction Site Related

What is SOR? Which department publishes SOR?

vivek gami
vivek gami

vivek gami

  • 54 Questions
  • 16 Answers
  • 5 Best Answers
  • 93 Points
View Profile
vivek gami User

What is SOR? Which department publishes SOR?

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on November 24, 2020 at 7:15 pm

    The schedule of rates provides a basic frame work to evaluate cost estimate of the projects. In the process of project costing based on this schedule of rates, the additional cost involved in carriage of materials from approved sources to site of work shall be added to arrive at the actual executionRead more

    The schedule of rates provides a basic frame work to evaluate cost estimate of the projects. In the process of project costing based on this schedule of rates, the additional cost involved in carriage of materials from approved sources to site of work shall be added to arrive at the actual execution cost.

    Central Public Works Department publishes SOR.

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 5 5 Answers
  • 497 Views
  • 0 Followers
Asked: December 13, 2017In: Construction Site Related

Minimum time required to complete activities in residential building construction?

Gopal Mishra
Gopal Mishra

Gopal Mishra

  • 70 Questions
  • 44 Answers
  • 7 Best Answers
  • 577 Points
View Profile
Gopal Mishra

I want to know minimum time required for finishing activities because I want to schedule a residential project in msproject  

  1. Komal Bhandakkar

    Komal Bhandakkar

    • 46 Questions
    • 255 Answers
    • 0 Best Answers
    • 2,040 Points
    View Profile
    Komal Bhandakkar AUTHOR
    Added an answer on October 5, 2020 at 8:57 pm
    This answer was edited.

    The most average time to build a multi family house which varies the number of units in a building. In 2014 building the twenty or more units took near about 15 months to complete from the time of obtaining permits. And properties with 10 to 19 units physically finished in 13.6 months whereas 5 to 9Read more

    The most average time to build a multi family house which varies the number of units in a building.

    In 2014 building the twenty or more units took near about 15 months to complete from the time of obtaining permits. And properties with 10 to 19 units physically finished in 13.6 months whereas 5 to 9 unit building came in at  11.5 months.

    The average time from permits to start does not follow the same pattern with respect to property size. Properties with 10 to 19 units had the longest average waiting period.


     

    See less
    • 28
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 5 5 Answers
  • 4,022 Views
  • 0 Followers
Asked: July 20, 2020In: Construction Site Related

What is the important of Proctor Compaction Test?

fathima
fathima

fathima

  • 26 Questions
  • 10 Answers
  • 0 Best Answers
  • 377 Points
View Profile
fathima Beginner

What is the important of Proctor Compaction Test?

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on September 13, 2020 at 9:22 pm

    Compaction test of soil is carried out using Proctor's test for understanding the compaction characteristics of different soils with change in moisture content. The ability for compacting a soil depends on the water content of the soil. Thus, water acts as a lubricant between the soil grains howeverRead more

    Compaction test of soil is carried out using Proctor’s test for understanding the compaction characteristics of different soils with change in moisture content. The ability for compacting a soil depends on the water content of the soil. Thus, water acts as a lubricant between the soil grains however as its content increases the water may occupy the entire pores. Since it is relatively incompressible in comparison to the air it may restrict compaction. Proctor compaction test is used to determine the optimum moisture content during compaction which gives the greatest soil density.

    See less
    • 32
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 5 5 Answers
  • 702 Views
  • 0 Followers
Asked: December 13, 2018In: Construction Site Related

Making of 1 Hour and 2 Hour Fire Rating Walls

sanjaylimbasia
sanjaylimbasia

sanjaylimbasia

  • 1 Question
  • 1 Answer
  • 0 Best Answers
  • 20 Points
View Profile
sanjaylimbasia User

What is method or procedure for making 1 hour and 2 hour fire rating walls?

  1. Komal Bhandakkar

    Komal Bhandakkar

    • 46 Questions
    • 255 Answers
    • 0 Best Answers
    • 2,040 Points
    View Profile
    Komal Bhandakkar AUTHOR
    Added an answer on October 5, 2020 at 9:11 pm
    This answer was edited.

    Making of 1hr and 2hr firing wall: This is one of the most popular questions. Basically, building codes typically require that the structure is wall roof floor, the roof is fire-resistant. The standards set forth by the International Building Code (IBC). fire resistant Wallis designed for a definiteRead more

    Making of 1hr and 2hr firing wall:

    This is one of the most popular questions.

    Basically, building codes typically require that the structure is wall roof floor, the roof is fire-resistant.

    The standards set forth by the International Building Code (IBC). fire resistant Wallis designed for a definite time period.

    According to ‘Commercial drafting and detailing book’, a one of our fire rated wall consists  2 x 4 studs spaced 16 inches from the centre of one stud to the centre of the next.


     

    See less
    • 30
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 5 5 Answers
  • 4,309 Views
  • 0 Followers
Asked: August 2, 2020In: Construction Site Related

What is surface excavation?

vivek gami
vivek gami

vivek gami

  • 54 Questions
  • 16 Answers
  • 5 Best Answers
  • 93 Points
View Profile
vivek gami User

What is surface excavation?

  1. nikeetasharma

    nikeetasharma

    • 23 Questions
    • 303 Answers
    • 0 Best Answers
    • 2,680 Points
    View Profile
    nikeetasharma Guru
    Added an answer on November 24, 2020 at 7:29 pm

    Surface excavation involves the removal of the exposed layer of the earth surface, including any vegetation or decaying matter which could make the soil compressible and therefore unsuitable for bearing structural loads. Hence the depth will be vary from site to site, usually range of 150-300 mm.

    Surface excavation involves the removal of the exposed layer of the earth surface, including any vegetation or decaying matter which could make the soil compressible and therefore unsuitable for bearing structural loads. Hence the depth will be vary from site to site, usually range of 150-300 mm.

    See less
    • 0
    • Share
      Share
      • Share on Facebook
      • Share on Twitter
      • Share on LinkedIn
      • Share on WhatsApp
  • 0
  • 5 5 Answers
  • 494 Views
  • 0 Followers
Load More Questions

Sidebar

Popular Articles

  • Gopal Mishra

    Types of Foundation for Buildings and their Uses [PDF]

  • Gopal Mishra

    Compressive Strength of Concrete -Cube Test [PDF], Procedure, Results

  • Padmanabhan G

    Methods of Rainwater Harvesting [PDF]: Components, Transport, and Storage

  • Sadanandam Anupoju

    16 Types of Heavy Equipment Used in Construction

  • Fasi Ur Rahman

    Standard Size of Rooms in Residential Building and their Locations

Recent Articles

  • Xian

    Bricklaying Robots in Construction #2

  • Xian

    Welcome to the Gutenberg Editor

  • Xian

    Bricklaying Robots in Construction

  • Ravi Panwar

    Rongjiang Bridge: The World’s Longest Bridge of Rigid Girder and Flexible Arch

  • Ravi Panwar

    Qinghai–Tibet Railway: The Longest and Highest Highland Railway in the World

Recent Questions

  • Shailendra

    In what case is a Shear Key provided in Foundation?

    • 0 Answers
  • Salman

    What is piping technology for termite treatment in building?

    • 0 Answers
  • nikeetasharma

    Which instrument is widely used for surveying?

    • 1 Answer
  • nikeetasharma

    Which type of reinforcement are used in pre-stressing?

    • 0 Answers
  • Bhavani Pesaru

    How can we use magnetic levitation method in civil engineering?

    • 0 Answers

Explore

  • Questions
    • Popular Questions
    • Trending Questions
    • New Questions
    • No Answer Questions
  • Ask Questions
  • Write for us
  • Building
    • Brick Masonry
    • Building Materials
    • Building Tips
    • Formwork/Shuttering
  • Concrete
    • Concrete Admixtures
    • Cement
    • Concrete Cracks
    • Concrete Properties
  • Construction
    • Construction Equipments
    • Construction Management
    • Construction Project
    • Estimating & Costing
  • How To Guide
    • Material Estimation
    • Repair/Protection Guide
    • Material Testing Guide
    • Mix Design Guide
    • Rate Analysis
  • Geotechnical
    • Foundation Engineering
    • Ground Improvement
  • Structural Engineering
    • Strengthening of Structure
    • Structual Inspection
    • Structural Detailing
  • Surveying
  • Tips

Footer

  • Home
  • About Us
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
  • Ask Questions
  • Write for us
  • Popular Questions
  • Facebook
  • Instagram
  • Telegram

© 2009-2021 The Constructor. All Rights Reserved.