Which size of aggregate used in RCC structure?
Thank you everyone.
Thank you everyone.
See lessJoin TheConstructor to ask questions, answer questions, write articles, and connect with other people. When you join you get additional benefits.
Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. When you join you get additional benefits.
Lost your password? Please enter your email address. You will receive a link and will create a new password via email.
Sorry, you do not have permission to ask a question, You must login to ask question. Become VIP Member
Do you need to remove the ads? Become VIP Member
Which size of aggregate used in RCC structure?
What should be the standard dimension of ventilator in home?
Thank you everyone.
Thank you everyone.
See lessGive the correct procedure of designing surplus weir.
Surplus weir (waste weir): It is a concrte or masonry structure constructed to dispose off excess water from an irrigation tank. It is a safety device in the tank. Full tank level (FTL): It is the highest level up to which water could be stored in the tank. Excess water will go out through the surplRead more
Surplus weir (waste weir): It is a concrte or masonry structure constructed to dispose off excess water from an irrigation tank. It is a safety device in the tank.
Full tank level (FTL): It is the highest level up to which water could be stored in the tank. Excess water will go out through the surplus weir. Fixation of this level depends on the availability/demand of water.
Max water level (MWL): It is the max level of water allowed in the tank. MWL is higher than FTL. The difference between MWL & FTL is the spillage or head on crest of surplus weir Fixation of this level depends on the submergence of land due to back water.
Tank bund level (TBL): It is the top level of the liqd of the bund & is equal to MWL + freeboard.
Abutment: The walls that flank the edge of a weir and which support the banks on each side of the weir. The length of the abutment is generally kept same as the base width of weir. The top level of the abutment is kept at tank bund level.
Wing wall: A wall on a weir that ties the structure into the bank in continuation of the abutments. Wing walls are provided both on the u/s and d/s sides on both the banks to ensure smooth entry and exit of water away from the tank.
Return wall (Return): These are provided at right angles to the abutment at the end of wing wall and extend into the banks to hold the back-fill.
Splay: Horizontal deviation of wall. Ex: 1 in 3, 1 in 5, etc.
Batter: Vertical deviation of wall. Ex: 1 in 8, 1 in 12, etc.
Hydraulic gradient, Saturation gradient (or) Seepage gradient: It is the head loss
(energy loss) per unit length in the direction of flow traveled by water particle through soil. Ex: Saturation gradient 4:1, it means to dissipate energy of 1m, water should travel a distance of 4 m in the soil
Catchment area(watershed area, drainage area, drainage basin or basin or
catchment): It is a portion of land which catches the rain and produces runoff through a one outlet.
Free catchment: Entire runoff in the catchment will be passed direct to tank. It means water from catchment area is not go to other tank or channels, and it should directly goes to one tank.
Intercepted catchment: Part of runoff will be intercepted and stored by the u/s side tank(s) within the catchment.
Combined catchment: Entire runoff in the catchment will be shared by group of tanks or a chain of tanks which comes under the same catchment.
D/S Apron of the surplus weir: Depending upon the foundation particulars, and the levels of U/S and D/S ground at the location of the work, any one of the following types can be adopted.
Type A → Horizontal masonry apron – when fall height < 75 cm
Type B → Sloping apron
Type C → Similar to B but with rough stone sloping
Type D → Stepped apron – when fall height ⩾ 75 cm
Location of surplus weir: It is desirable to locate the surplus weir at or near the flank of the tank bund and connected to it, and also at a place where it is possible to drain the surplus waters below the work away from the tank bund falling into its natural watercourse. The cost of works should be minimum.
Design a surplus weir for a minor tank forming a group of tanks with the following data:
Combined catchment area = 25.89 km2 (35 km2)
Intercepted catchment area = 20474 km2 (10 km2)
Top width of the bund =2m (2m)
Side slopes of the bund = 2:1 both sides (2:10n both sides)
Top level of bund = +1450 (+ 12.50)
Maximum Water Level (MWL) =+ 12.75 (+ 10.75)
Full Tank Level (FTL) = + 12.00 (+ 10.00)
General ground level at the site =+ 11.00 (+ 9.00)
Ground level slopes off to a level in about 6 m distance) = + 10.00 (+ 8.00 in about 6 m dist)
The foundations are of hand gravel = + 9.50 (+ 7.50)
Saturation gradient = 4:1 with 1 m clearcover (4:1 with 1m clearcover)
Provision is to be made to store water up to MWL in-times of necessity
Components to be designed
(1) Estimation of flood discharge entering the tank (Q) :
Combined catchment area (M) # 25.89 km2
intercepted catchment area (m) = 20.71 km2
Assuming Ryve’s coefficient(C) =9 and c = 1.5
Flood discharge (Q) = CM2/3 – cm2/3
Q = 9 (25.89)2/3 — 1.5 (20.71)2/3 = 78.77 — 11.32
Q = 67.45 m3/s
(2) Length of surplus weir (L):
Assuming the flow over a surplus weir is identical to that of flow over a rectangular weir then discharge is given by Q = 2/3 CdL √2g h3/2
where, Q = 67.45 m3/s, cd = 0.562 (assuming), g = 9.841 m/s2
h = MWL – FTL = 12.75 — 12.00 = 0.75 m, L — Length of the water way
67.45 = 2/3 x 0.562 x L √2×9.81 (0. 7s)3/2 → L=62.75 m ≈ 63.00 m (say)
Since temporary regulating arrangements are to be made on top of weir to store water at times of necessity.
The dam stones of size 15 x 15 x 125 cm are at 1m clear internals keeping top of the stone at M.W.L.
The no. of openings will be = 63, The no. of dam stones required = 62
∴ The overall length of surplus weir between abutments = 63 + (62 x 0.15)
= 72.30 m
However, provide an overall length of 75 m.
(3) Height of the weir (H):
Crest Level = FTL = +12.00
Top of dam stones (top of shutters) = M.W.L = + 12.75
Ground level = + 11.00
Hard soil at the foundation is + 9.50.
However, taking foundations about 0.50 m deep into hard soil and fix up foundation level at + 9.00
Assuming foundation concrete is 60 cm thick
Top of foundation concrete = + 9.60
Height of weir above foundations (H) = 12.00 – 9.60 = 2.4m
(4) Crest width of weir (a):
a = 0.55 (√H + √h) = 0.55(√2.4 + √0.75) = 1.3m
(5) Base width of weir (b):
The base width is determined based on moment considerations. i.e., based on the magnitude of stabilizing and destabilizing moments.
Stabilizing moments are caused by self weight of the weir which is given by
M = γw /12 = [{(G+15)H + 2.5S}b2 + a(GH – H – S)b – ½a2 (H +3S)]
Where, γw = Unit weight of water = 1000 kg/m3
G = Specific gravity of masonry = 2.25
H = Height of the weir = 2.40 m
a = Crest width of weir = 1.30 m
b = Base width of the weir = ?
S = h = height of shutter above weir crest = 12.75 – 12.00 = 0.75 m
Destabilizing moments (M,)
Mr = γw (H + S)3 / 6
Equating both the moments: M,=M
Mr = (2.4 + 0.75)3 / 6 = 1 /12 [{2.25 + 1.5)2.4 + 2.5 x 0.75} b2 + 1.3 (2.25 x 2.4 – 2.4 – 0.75)b – ½ (1.3)2 (2.4 + 3 x 0.75)]
Solving, b = 2.4 m
(6) Abutments, Wing walls and Returns:
The top width of abutments, wing walls & returns will all be uniformly 0.50 m with a front batter of 1 in 8. Diag in attachment.
Abutment (AB)
Length of the abutment = width of bund = 2m
The top level of the abutment is kept at TBL = + 14.50
Bottom level of the abutment = top of foundation level = + 9.60
Height of the abutment = 14.50 — 9.60 = 4.90 m
Bottom width= 0.4 x height = 0.4 x 4.90 = 1.96 m = 2.00 m (say)
Top width 2 0.5 m (assuming), Front batter = 1 in 8
Wing walls:
U/S Wing Wall:
BD is called u/s wing wall
Section at B:
Same as the section of abutment
Wing wall from B to C is sloping and
Top level of C = M.W.L + 30 cm = 12.75 + 0.30 = 13.05
Section at C:
Top Level at C = 13.05
Bottom level = 9.60
Height of wing wall = 13.05 – 9.60 = 3.45 m
Bottom width = 0.4 x height = 0.4 x 3.45 = 1.38 = 1.40 m (say)
Top width from B to C is the same as 0.5 m.
But, bottom width gets slowly reduced
from 2.00 m at section at B to 1.40 m at Section C:
From C to D wing wall is horizontal. Therefore, Section at D = Section at C
U/S Return (DE):
Section at E = Section at D
U/S transition:
In order to give an easy approach, the u/s side wing wall may be splayed at 1 in 3.
D/S wing wall:
AF is called d/s wing wall.
Section at A: Same as the section of abutment. The Wing wall from A to F will slope down till the top reaches the ground level at F.
Section at F:
Top of wing wall at F = + 11.00
Bottom of wing wall = + 9.60
Height = 11.00 – 9.60 = 1.40 m
Bottom width = 0.4 x 1.4 = 0.56 m
However, provide a minimum of 0.6 m
D/S return (FG):
The same section at F is continued for FG also
D/S transitions:
Provide a splay of 1 in 5.
(7) Aprons of the weir:
i). U/S Apron: Though apron is not required on the u/s side of the weir, a puddle clay apron is usually provided to minimize the seepage under the weir.
ii).D/S Apron: Since the ground level is falling down to +10.00 in a distance of about 6m. Then, the fall is (12.00 – 10.00) = 2.00 m > 0.75 m therefore provide a stepped apron (Type D) Diagram in attachment. The stepping may be done in two stages.
(a) The length of the Apron: The length of the apron should be adequate to avoid piping problem.
[Maximum uplift will be occurred when water level on U/S is up to top of dam stone (M.W.L.) and no water on D/S (+10.00))
Max. Uplift head = 12.75 – 10.00 = 2.75 m (max. energy to be dissipated)
Assuming a hydraulic gradient of 1 in 5
The length of the creep required = 2.75 x 5 = 13.75 m
The length and thickness of apronts to be designed.
The length of the creep = AB + BC + CD + DE + EF = 1.40 + 0.60 + 3.00 + DE + 1 (Assuming EF = 1 m)
This length should not be less than 13.75 m, if the structure is to be safe.
13.75 = 1.40 + 0.60 + 3.00 + DE + 1 → DE = 7.75 m = 8.0 m (say)
Provide total length of solid apron ts 8 m.
First step in 3 m and second step in 5 m length.
(b) Thickness of solid apron: The maximum uplift on the apron is felt immediately above the point D. (i.e., at point K)
Assuming the thickness of apron at point K = 80 cm = 0.80 m.
Then the level of K = 11.00 – 0.80 = 10.20
The length of the creep from A to K = 1.4 + 0.6 + 3 + 0.6 + (10.20 – 9.60) = 6.20 m
Head loss in percolation along the path up to the point K = 6.20/5 = 1.24 m
Residual head exerting uplift under the apron at point K = 2.75 – 1.24 = 1.51 m
Thickness of apron required = Residual head / Sp. gravity = 1.51/2.25 = 0.67 m
Provide 20% of more thickness as a safety
Then thickness of apron required = 0.80 m
So, provide the first solid apron as 80 cm thick.
The second apron can be similarly checked for a thickness of 50 cm.
8) Talus: At the end of d/s side apron, a nominal 3 to § m length of Talus (i.e., rough stone apron) with a thickness of 50 cm may be provided as a safety mechanism.
See less
What is Reinforced Brick Masonry? Explain the method of construction.
Reinforced brick masonry (R.B. Masonry) : Definition: Composite structural material that consists of load-bearing brickwork masonry with reinforcement. Important parameter regarding reinforced brick masonry: A suitable length of metal (usually it is steel) is inserted in brickwork for proper bond foRead more
Definition:
Composite structural material that consists of load-bearing brickwork masonry with reinforcement.
Important parameter regarding reinforced brick masonry:
Construction materials needed :
Applications of reinforced brick masonry :
Advantages of reinforced brick masonry over conventional brick masonry :
Is it necessary to add a plinth beam between two columns, constructed for installing an iron gate?
If the columns and their foundations have been designed considering the loads (direct force and moment) from the iron gates then a tie beam at ground level is not necessary. But a tie beam can help in reducing the foundation width in one direction as this beam will help to prevent overturning in oneRead more
If the columns and their foundations have been designed considering the loads (direct force and moment) from the iron gates then a tie beam at ground level is not necessary.
But a tie beam can help in reducing the foundation width in one direction as this beam will help to prevent overturning in one direction (if the columns are not joined by plinth beams towards wall boundaries). Another benefit of a tie beam is the extra strength provided in case of impact by a vehicle to the columns.
See less
The rebound hammer test is a non-destructive test for the strength of concrete for field testing of concrete. As per the Indian code IS: 13311(2)-1992, the rebound hammer test has the following objectives: To determine the compressive strength of the concrete by relating the rebound index and the coRead more
The rebound hammer test is a non-destructive test for the strength of concrete for field testing of concrete.
As per the Indian code IS: 13311(2)-1992, the rebound hammer test has the following objectives:
The instrument can be used on both horizontal and vertical surfaces. The main point to be noted is that the graph had to be read appropriately. These days, the hammer is equipped with a digital scale to make life easier.
The IS: 13311(2)-1992 elaborates the procedure in a more detailed manner, making it easier for even beginners to understand the concept.
The point of impact should be at least 20 mm away from any edge or shape discontinuity. For taking a measurement, the rebound hammer should be held at right angles to the surface of the concrete member.
The apparatus is placed on the spot where the test is desired. The hammer is allowed to drop freely. After it strikes the concrete surface it rebounds back. The raise of the rebound is recorded. This test is repeated at different locations and the rebound value is recorded.
The compressive value of concrete is obtained by doing a cube test of the test cube of the batch of concrete on which the rebound test is conducted. The value of rebound and compressive strength of concrete is compared and the value of compression is adjudged from the values of compression test and rebound values.
Around each point of observation, six readings of rebound indices are taken 2nd average of these readings after deleting outliers as per IS 8900: 1978 becomes the rebound index for the point of observation. ( This outlaying is a calculation based method, can be discussed on one’s interest).
Now, we will calculate comp. Strength from rebound number. There are three positions of taking reading
This is why, there are three graphs in Rebound Number-Compressive Strength graph of Rebound Hammer.
You will have to calculate the strength from the graph as per position of Rebound Hammer.
For Example,
For Vertical Upward position of Hammer
If 15 Rebound number readings are
48,42,43,43,44,44,45,45,45,45,46,47,48,50
, as per IS:8900, Clause 5.1.1(TESTS FOR TWO OR MORE OUTLIERS , AT LEAST ONE OUTLIER AT EACH END), 42 and 50 are Outlaying values.
Removing those, Average Rebound number is 45.27
From the graph( fro Vertical Upward) , Compressive Strength Will be 40.54 Mpa
See lessWhy Sri Jagannath Puri Temple is not producing it’s shadow?
Jagannath Puri temple : Here I will tell you the reason behind why Jagannath Puri temple not producing its own shadow. Reason : Jagannath Puri temple has a dome and the shadow of dome always fall on the building itself so that we can't able to see it You can clearly understand from the above pictureRead more
Here I will tell you the reason behind why Jagannath Puri temple not producing its own shadow.
Reason :
I hope you agree with my answer.
Thank you.
See lessHow to use AAC block instead of brick on the site in masonry wall construction? What should be requirement of water cement ratio? How to construct wall by using AAC block?
AAC blocks are supposed to be treated like vitrified tiles for their level of moisture absorption and time for curing. Using a standard 1:6 mortar would work just as fine as long as any hammering needs to be done for chasing or cladding building services. Though different companies manufacture and sRead more
AAC blocks are supposed to be treated like vitrified tiles for their level of moisture absorption and time for curing. Using a standard 1:6 mortar would work just as fine as long as any hammering needs to be done for chasing or cladding building services.
Though different companies manufacture and sell AAC block adhesives, which may cost about ?650–900 a bag, this question asks for a mix ratio, so I’m going to give one.
Mix ratio
If you use a coarse (double washed) M sand and have access to good quality OPC cement, a ratio of 1:2 to 1:3.3 would work. Unlike tile adhesives, exposed cement faces are prone to thermal contraction and early dehydration; hence, add a styric butadiene rubber cement additive. Or any other polyester/rubber based additive that improves the elastic properties of the cementing agent. My suggestion would be Fosroc SBR latex or Zydex’s EB50, and no none of them sponsored this answer. You’d find equivalent chemicals in Sika, BASF in various names, but they’re all ultimately the same. Dosage may vary from brand to brand, and so does packaging, cure, and set times. Make sure to use optimal amounts of these additives as they may affect the final adhesion of mortar plaster to the blockwork.
However, maintaining a uniform grade of mortar or constant w/c ratio at the site is tedious, so a premixed bad might come in handy. The thickness of the application may not exceed 5–8mm.
Workability
The consistency needs to be like a paste(obviously) easy to apply using a notched trowel. If you’re using a thicker bonding layer, your mix might end up cracking and may require additional microfibers to stick together. Water cement ratio of about 33–40% should work. Depending on your curing and additive, this could reduce to up to 28% nothing more.
Setting and curing
AAC blocks have significantly less initial water absorption. However, some water will be lost during the initial set. Adequate curing for 3–7 days is advisable. May vary depending on the use of additives and water content but curing never does any harm, so do them anyways. The maximum height to be built per day should be curtailed to four-course at any cost. Do include a stiffener beam (these are curtain walls anyways) every four feet for a 4? wall.
Structural reliability
I strongly discourage the idea of using AAC blocks in confined masonry without columns. As much as I’ve researched, they cannot be used as structural walls, especially for multi-storied buildings. Ideal to be used in framed structures as a partition or curtain walls. They’re good enough to hold cladding but not structural cladding like heavy hoists or lift counterweights.
See less
nikeetasharma
Generally the most appropriate size of aggregate used in RCC structure is 20mm. It gives more strength to the structure.
Generally the most appropriate size of aggregate used in RCC structure is 20mm. It gives more strength to the structure.
See less